Laserfiche WebLink
Onsite Permit 555-20-007035-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555047053179 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> a W <br /> Date issued 11/1712.0 x � Era#aon date 11'/ 7121 <br /> m «, wAP r ap t a33 s a 1.ttg <br /> Wurkds+E�rptcot� IT4 EE�R,�� R� 3 <br /> Special Requirements <br /> Stake out required: Yes <br /> Groundwater type: Temporary Groundwater depth: N/A <br /> Groundwater interceptor: N/A Groundwater interceptor depth: 42 in. <br /> Groundwater interceptor drain media amt: 18 in. <br /> Other special rqmt: 42 inch curtain drain required, install to DEQ rules <br /> rodent guard required on the outlet of curtain drain, 10 ft setback above drainfield <br /> Conditions of approval <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> -All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface. <br /> Twenty-inch minimum diameter if less than 36-in deep. Thirty-inch minimum diameter if greater <br /> than 36-in deep. Maintain access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance <br /> with the construction plan approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website <br /> at: http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be <br /> placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> -Effluent sewer. The effluent sewer must extend at least 5 feet beyond the septic tank before <br /> connecting to the distribution unit. It must be installed with a minimum fall of 4 inches per 100 feet <br /> and at least 2 inches of fall from one end of the pipe to the other. In addition, there must be a <br /> minimum difference of 8 inches between the invert of the septic tank outlet and either the invert of <br /> the header to the distribution pipe of the highest lateral in a serial distribution field or the invert of <br /> the header pipe to the distribution pipes of an equal distribution absorption field. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level, and bedded. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Serial distribution, each trench bottom to be level and on contour. Use Drop box(es). <br /> 11/17/20:11:19:20AM Page 2 of 3 ONS_OnsitePemiitpr <br />