Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Cummings Elementary School | Site Plan <br />SALEM-KEIZER PUBLIC SCHOOLS <br />Legend NORTH <br />11 <br />22 <br />33 <br />44 <br />Multipurpose room <br /> The cafeteria will be expanded to provide <br />adequate space for lunch and for use as a <br />multipurpose space. <br />Seismic upgrades <br /> The media center and other select areas of the <br />school will receive seismic strengthening. <br />Secure front entrance <br /> A secure vestibule will be built at the front entry. <br />Sidewalk addition <br /> A paved pedestrian pathway will be constructed <br />on district-owned property along Delight Street. <br />1.2.2020 <br />11 <br />22 <br />33 <br />44 <br />2018 Bond Programsalemkeizer.org/cummings-bond <br />ARCHITECT: <br />CONTRACTOR: <br />TOTAL PROJECT BUDGET*: <br />CONSTRUCTION START: <br />SUBSTANTIAL COMPLETION: <br />BBT Architects <br />Cedar Mill <br />$1.9 million <br />June 2020 <br />August 2020 <br />Additional or Expanded Space <br />Improvements <br />• Remove or replace old portable classroomCummings Elementary School will see a cafeteria expansion to address the undersized lunchroom and other improvements to enhance safety and security. <br />• Heating/ventilation system improvements <br />• Sidewalk expansion <br />• Intercom system upgrade <br />• Seismic improvements <br />• Cafeteria/multipurpose space expansion <br />• Creation of a secured vestibule at the front entry <br />May 2020 <br />Cummings Elementary School <br />salemkeizer.org/projects-status*Includes bond funds and grants