| MCSR 39483 
<br />PRE -CONSTRUCTION RECORD OF SURVEY 
<br />LOCATED IN THE NORTHEAST ONE—QUARTER AND THE SOUTHEAST ONE—QUARTER 
<br />NARRATIVE OF SECTION 10, TOWNSHIP 8 SOUTH, RANGE 3 WEST, W.M. 
<br />CIN OF SALEM, MARION COUNTY, OREGON 
<br />PURPOSE SURVEYED: OCTOBER 12, 2021 
<br />THE PURPOSE OF THIS SURVEY IS TO LOCATE SURVEY MONUMENTATION THAT MAY BE 
<br />DISTURBED OR DESTROYED 
<br />ROADWAY LOCATIONS — 
<br />CONTINUED 
<br />DURING CONSTRUCTION ALONG HILFlKER STREET SE BETWEEN THE INTERSECTION WITH 
<br />ROAD 837) AND A POINT 350 FEET EAST OF COMMERCIAL STREET SE, AND TO MEET 
<br />SUNNYSIDE ROAD SE (COUNTY 
<br />THE REQUIREMENTS 
<br />SUNNYSIDE ROAD SE WEST 
<br />RIGHT-OF-WAY RESOLUTION NO. 98-162, REEL 1226 PAGE 183 AND REEL 1 237 
<br />209.155. THIS SURVEY WAS PREPARED FOR CITY OF SALEM. 
<br />OF O.R.S. 
<br />PAGE 178) 
<br />MCSR 8807, MSCR 16285 AND MCSR 18240. IN PARTICULAR, THE POINT 
<br />WHERE THE CENTERLINE 
<br />OF HILFlKER 
<br />THE WEST RIGHT-OF-WAY LINE OF 
<br />SUNNYSIDE ROAD SE PER REEL 1237 PAGE 178 WAS THEN LOCATED PARALLEL WITH AND A 
<br />THIS SURVEY RESOLVES THE EXISTING CENTERLINES AND RIGHT-OF-WAY LINES ALONG 
<br />THE PROJECT CORRIDOR AND 
<br />CALCULATED 31.00 FEET WESTERLY 
<br />WHEN MEASURED AT RIGHT ANGLES TO THE ABOVE-DESCRIBED CENTERLINE. THIS WAS DETERMINED 
<br />ALSO ESTABLISHES A SURVEY CONTROL NETWORK. 
<br />PREVIOUSLY DESCRIBED 
<br />BY COMPARING THE CURVE RADIUS 
<br />OF THE SAID CENTERLINE WITH THE WEST RIGHT-OF-WAY LINE PER SAID REEL 1237 PAGE 178. 
<br />BASIS OF BEARINGS AND HORIZONTAL CONTROL DATUM 
<br />THE HORIZONTAL COORDINATES SHOWN ON THIS SURVEY ARE LOCAL DATUM PLANE GROUND COORDINATES, AND ARE 
<br />REFERENCED TO N AD83(201 1 )(EPOCH 2010.00), OREGON COORDINATE REFERENCE SYSTEM (OCRS), SALEM ZONE, WITH 
<br />DISTANCES MEASURED IN INTERNATIONAL FEET. OCRS SALEM ZONE COORDINATES WERE ESTABLISHED FOR CONTROL 
<br />POINTS 1, 2, AND 3 UTILIZING GPS METHODS TO ESTABLISH A PROJECT BASELINE. ALL REDUNDANT GPS VECTORS 
<br />WERE LEAST SQUARES ADJUSTED TO THE 959 CONFIDENCE INTERVAL. 
<br />TERRESTRIAL SURVEY METHODS WERE THEN USED TO COMPLETE A PROJECT TRAVERSE AND CONTROL TIES. A LEAST 
<br />SQUARES ADJUSTMENT WAS THEN COMPLETED TO THE 959 CONFIDENCE INTERVAL TO ADJUST ALL TERRESTRIAL 
<br />SURVEY TIES, HOLDING THE OCRS SALEM ZONE COORDINATES FOR CONTROL POINTS 1, 2, AND 3 FIXED. 
<br />FOR THE PURPOSES OF THIS SURVEY, THE BASIS OF BEARINGS IS N08 -17'33"E, AS MEASURED ALONG THE CENTERLINE 
<br />OF SUNNYSIDE ROAD SE, BETWEEN FOUND MONUMENTS 54 AND 55. 
<br />VERTICAL CONTROL DATUM 
<br />THE ELEVATION DATUM FOR THIS SURVEY IS CITY OF SALEM (NGVD29-47) BASED UPON CITY BENCHMARK 8300, 
<br />ELEVATION = 406.76 FEET. A CLOSED DIGITAL LEVEL LOOP WAS COMPLETED UTILIZING SAID BENCHMARK AND 
<br />CONTROL POINTS 1-3. A LEAST SQUARES ADJUSTMENT TO THE 95% CONFIDENCE INTERVAL WAS COMPLETED FOR THE 
<br />LEVEL LOOP. SEE SURVEY CONTROL TABLE FOR RESULTING ELEVATIONS FOR CONTROL POINTS 1-3. 
<br />ROADWAY LOCATIONS 
<br />SUNNYSIDE ROAD SE CENTERLINE (PER MCSR 33954) 
<br />THE CENTERLINE OF SUNNYSIDE ROAD SE PER MCSR 33954 WAS LOCATED BY HOLDING FOUND MONUMENTS 51, 52, 53, 
<br />54, AND 55, TOGETHER WITH RECORD DATA PER SAID SURVEY AS SHOWN. THE STATIONING SHOWN FOR SUNNNYSIDE 
<br />ROAD SE IS PER MCSR 33954. 
<br />SUNNYSIDE ROAD SE (COUNTY ROAD 837) 
<br />THE CENTERLINE OF COUNTY ROAD 837 (60' WIDE) CANNOT BE ACCURATELY LOCATED DUE TO A LACK OF ORIGINAL 
<br />MONUMENTS. MCSR 4249, COMMISSIONERS COURT JOURNAL 21 PAGES 480-482, AND THE NOTES FOR ROAD BOOK 
<br />ENTRY NO. 459 (ROAD BOOK 5 PAGES 377-378) INDICATE THE PRESENCE OF IRON PIPES LOCATED AT 1 MILE 
<br />INTERVALS ALONG THE CENTERLINE. THESE MONUMENTS WERE NOT RECOVERED BY MCSR 33950, MCSR 33954, MCSR 
<br />34485, MCSR 35260, MCSR 36902, ODOT HIGHWAY MAPS, OR ANY OTHER AVAILABLE SURVEYS. THIS SURVEYOR 
<br />ACCEPTS THAT THESE PREVIOUS SURVEYS DID THEIR DUE DILIGENCE AND THESE MONUMENTS NO LONGER EXIST. 
<br />FURTHERMORE, THIS SURVEYOR ACKNOWLEDGES THAT ANY ATTEMPT TO RESOLVE THE LOCATION OF THE ORIGINAL 
<br />CENTERLINE AND RIGHT-OF-WAY LINES OF COUNTY ROAD 837 WOULD NOT FIT WITH THE EXISTING IMPROVEMENTS AND 
<br />OCCUPATION. THEREFORE ACCEPTED RIGHT-OF-WAY LINES HAVE BEEN LOCATED AS DESCRIBED BELOW. 
<br />IT SHOULD BE NOTED THAT A PORTION OF SUNNYSIDE ROAD SE (COUNTY ROAD 837) IN SECTIONS 23 AND 26, 
<br />TOWNSHIP 8 SOUTH, RANGE 3 WEST, WERE LEGALIZED AS SHOWN ON MCSR 36902. 
<br />SUNNYSIDE ROAD SE (ACCEPTED EAST RIGHT-OF-WAY - NORTH OF HILFlKER LANE SE) 
<br />THE ACCEPTED EAST RIGHT-OF-WAY LINE OF SUNNYSIDE ROAD SE WAS LOCATED BY HOLDING POINT "A" AND FOUND 
<br />MONUMENT 75. POINT "A" IS THE CALCULATED LOCATION OF FOUND MONUMENT 21 SHOWN ON MCSR 33954 AND SET 
<br />BY MCSR 29277. THE ORIGIN OF FOUND MONUMENT 75 IS UNKNOWN, BUT WAS FOUND BY MCSR 15742. THIS 
<br />SOLUTION FIT POINT "B" FOR 0.08'. POINT "B" IS THE CALCULATED LOCATION OF FOUND MONUMENT 20 SHOWN ON 
<br />MCSR 33954 AND SET BY MCSR 24502. 
<br />SAID ACCEPTED EAST RIGHT-OF-WAY LINE WAS EXTENDED SOUTHERLY A RECORD DISTANCE PER MCSR 29277 TO 
<br />POINT "C" AS SHOWN. POINT "C" IS THE CALCULATED LOCATION OF A PK NAIL SET BY MCSR 29277, BASED ON 
<br />RECORD DATA FROM MCSR 24502. MCSR 24502 FOUND AN IRON PIPE AT THIS LOCATION AS SHOWN ON MCSR 8807, 
<br />MCSR 15742, MCSR 16285, AND MCSR 18240. CALCULATED POINT "C" MATCHES THE RECORD DISTANCE PER MCSR 
<br />24502 FROM THE CALCULATED 1X4 CORNER BETWEEN SECTIONS 10 AND 11 AS SHOWN FOR 0.02'. CALCULATED POINT 
<br />"C" ALSO MATCHES THE RECORD DISTANCE FROM FOUND MONUMENT 75 PER MCSR 15742 FOR 0.01' 
<br />SUNNYSIDE ROAD SE (ACCEPTED EAST RIGHT-OF-WAY - SOUTH OF HILFlKER LANE SE) 
<br />THE ACCEPTED EAST RIGHT-OF-WAY LINE OF SUNNYSIDE ROAD SE WAS LOCATED BASED UPON MCSR 18240. FROM 
<br />CALCULATED POINT "C" DESCRIBED ABOVE, A CALCULATED RECORD DISTANCE OF 33.00 FEET WEST ALONG THE 
<br />CENTERLINE OF HILFlKER LANE SE (DESCRIBED LATER IN THIS NARRATIVE) PER MCSR 18240, MCSR 16285, AND MCSR 
<br />8807 WAS HELD TO LOCATE THE INTERSECTION OF THE CENTERLINE OF HILFlKER LANE SE AND THE CENTERLINE OF 
<br />SUNNYSIDE ROAD -SE PER SAID MCSR 18240. THE CENTERLINE OF SUNNYSIDE ROAD SE PER MCSR 18240 WAS THEN 
<br />LOCATED BY HOLDING THE ABOVE-DESCRIBED INTERSECTION AND A POINT 30.00 FEET WESTERLY WHEN MEASURED AT 
<br />RIGHT ANGLES TO POINT "E". POINT "E" IS THE CALCULATED LOCATION OF FOUND MONUMENT 34 SHOWN ON MCSR 
<br />33954 AND SET BY MCSR 18240. THE ACCEPTED EAST RIGHT-OF-WAY LINE OF SUNNYSIDE ROAD SE WAS LOCATED 
<br />PARALLEL WITH AND 30.00 FEET EASTERLY WHEN MEASURED AT RIGHT ANGLES TO THE SAID CENTERLINE PER MCSR 
<br />18240. 
<br />SUNNYSIDE ROAD SE (ACCEPTED WEST RIGHT-OF-WAY - PRINGLE CREEK PARK ADDITION) 
<br />THE ACCEPTED WEST RIGHT-OF-WAY LINE OF SUNNYSIDE ROAD SE WAS LOCATED BY HOLDING POINT "D" AND FOUND 
<br />MONUMENT 57. POINT "D" IS THE CALCULATED LOCATION OF FOUND MONUMENT 91 SHOWN ON MCSR 33954 AND SET 
<br />BY THE PLAT OF "PRINGLE CREEK PARK ADDITION FOUND MONUMENT 57 WAS SET BY "PRINGLE CREEK PARK 
<br />ADDITION". 
<br />MCSR 39483 
<br />THE WEST RIGHT-OF-WAY LINE OF SUNNYSIDE ROAD SE PER RESOLUTION NO. 98-162 (SEE ALSO REEL 1226 PAGE 183) WAS LOCATED 
<br />PARALLEL WITH AND 31.00 FEET WESTERLY WHEN MEASURED AT RIGHT ANGLES TO THE ABOVE-DESCRIBED CENTERLINE. 
<br />A REVIEW WAS COMPLETED OF SAID REEL 1237 PAGE 178, SAID REEL 1226 PAGE 183, AND REEL 1213 PAGE 81 (SOUTH OF THIS AREA), 
<br />TOGETHER WITH MCSR 33954 AND MCSR 34325. UPON PRELIMINARY REVIEW OF THE DESCRIPTIONS IT WOULD APPEAR THAT THE 
<br />RIGHT-OF-WAY IN THIS AREA WOULD HAVE BEEN 7.00 FEET WESTERLY OF THE ORIGINAL RIGHT-OF-WAY OF SUNNYSIDE ROAD SE 
<br />(COUNTY ROAD 837). HOWEVER, THE BEARINGS ON REEL 1226 PAGE 183 AND REEL 1213 PAGE 81 MATCH THOSE OF THE MONUMENTED 
<br />CENTERLINE PER MCSR 33954, NOT THE SAID ORIGINAL CENTER SHOWN ON SAID SURVEY. IN ADDITION, THE CURVE RADIUS MATCHES A 
<br />31.00 FOOT OFFSET FROM THE MONUMENTED CENTERLINE PER MCSR 33954. 1 THEREFORE CONCLUDED THAT THE INTENT WAS FOR THE 
<br />WEST RIGHT-OF-WAY TO BE PARALLEL WITH AND 31.00 WESTERLY WHEN MEASURED AT RIGHT ANGLES TO THE SAID MONUMENTED 
<br />CENTERLINE. THIS IS CONSISTENT WITH MCSR 34325 AND MATCHES THE EXISTING ROADWAY IMPROVEMENTS IN THIS AREA. 
<br />HILFlKER LANE SE (CENTERLINE) 
<br />THE CENTERLINE OF HILFKER LANE SE WAS LOCATED BY HOLDING THE ABOVE-DESCRIBED POINT "C" AND FOUND MONUMENT 101 PER 
<br />MCSR 39415. THIS SOLUTION IS CONSISTENT WITH MCSR 8807, MCSR 15742, MSCR 16285, MCSR 18240, MCSR 24502, AND MCSR 29277. 
<br />THIS SOLUTION ALSO MATCHES THE RECORD 30.00 FOOT OFFSET FROM FOUND MONUMENT 74 PER THE PLAT OF "WILDRIDGE". THE 
<br />STATIONING SHOWN FOR HILFlKER LANE SE IS PER THIS SURVEY. NOTE THAT FOUND MONUMENT 53 APPEARS TO HAVE BEEN SET ON A 
<br />CONSTRUCTION/PROJECT ALIGNMENT LOCATION AND WAS NOT HELD FOR THE CENTERLINE OF HILFlKER LANE SE. 
<br />HILFlKER LANE SE (VOLUME 202 PAGES 276-277 AND GATEWAY ROAD) 
<br />AN EXCEPTION FOR A ROADWAY FIRST APPEARED IN VOLUME 202 PAGE 276-277 IN MAY 8TH OF 1929. THIS EXCEPTION WAS FOR A 
<br />15.00 FOOT WIDE ROAD LYING ON THE NORTHERLY SIDE OF THE SOUTH LINE OF THE NORTHEAST ONE-QUARTER OF SECTION 10 BETWEEN 
<br />THE ONE-QUARTER CORNER COMMON TO SECTIONS 10 AND 11, AND THE EAST SIDE OF THE COUNTY ROAD LEADING FROM SALEM TO 
<br />JEFFERSON (COUNTY ROAD 837). THERE DOES NOT APPEAR TO BE A FORMAL DEDICATION FOR THIS 15.00 FOOT WIDE STRIP, HOWEVER 
<br />DUE TO THE PRESENCE OF THE EXISTING ROADWAY AND SUBSEQUENT DEDICATIONS, IT IS BELIEVED THAT A COMMON LAW DEDICATION 
<br />WAS FORMALLY OR IMPLIEDLY ACCEPTED BY THE CITY OR COUNTY. 
<br />A REVIEW WAS ALSO COMPLETED OF MARION COUNTY CLERK FILE NO. CF0968 FOR A GATEWAY ROAD ALONG HILFlKER LANE SE BETWEEN 
<br />THE ONE-QUARTER SECTION CORNER COMMON TO SECTIONS 10 AND 11, AND THE EAST SIDE OF THE PACIFIC HIGHWAY (COMMERCIAL 
<br />STREET SE). IT IS UNCLEAR IF THIS GATEWAY ROAD WAS FORMALLY ACCEPTED AS DEPICTED ON MCSR 12290 AS NO FINAL ORDER 
<br />APPEARS TO BE LOCATED IN THE FILE. FURTHERMORE, THE RESULTING 30.00 FOOT RIGHT-OF-WAY DOES NOT APPEAR TO HAVE BEEN 
<br />ACCEPTED SINCE ADDITIONAL RIGHT-OF-WAY DEDICATIONS/RESERVATIONS WERE COMPLETED ALONG THE SOUTH SIDE OF HILFlKER LANE SE 
<br />BETWEEN THE SOUTH LINE OF THE NORTHEAST ONE-QUARTER OF SECTION 10 AND THE EXISTING SOUTH RIGHT-OF-WAY. 
<br />HILFlKER LANE SE 
<br />(SOUTH RIGHT-OF-WAY PER 
<br />REEL 257 PAGE 1371) 
<br />A REVIEW OF REEL 257 
<br />PAGE 1371 INDICATED THAT IS WAS 
<br />BASED ON DIMENSIONS ALONG THE 
<br />CENTERLINE OF HILFlKER 
<br />LANE SE THAT 
<br />WERE CONSISTENT WITH 
<br />MCSR 8807, MSCR 16285 AND MCSR 18240. IN PARTICULAR, THE POINT 
<br />WHERE THE CENTERLINE 
<br />OF HILFlKER 
<br />LANE SE INTERSECTS THE CENTERLINE OF SUNNYSIDE ROAD 
<br />SE (AS SHOWN ON SAID SURVEYS) 
<br />IS 33.00' WESTERLY OF THE ABOVE 
<br />DESCRIBED POINT "C". 
<br />BY LOCATING THE ACCEPTED EAST RIGHT-OF-WAY OF SUNNYSIDE ROAD 
<br />SE (SOUTH OF HILFlKER 
<br />LANE SE) AS 
<br />PREVIOUSLY DESCRIBED 
<br />IN THIS NARRATIVE, THIS SOLUTION 
<br />YIELDED A MEASURED DISTANCE OF 
<br />161.03' (RECORD 161.11') 
<br />ALONG THE 
<br />CENTERLINE OF HILFlKER LANE SE AS SHOWN ON SHEET 3. 
<br />THE SOUTH RIGHT-OF-WAY LINE OF HILFlKER LANE SE PER SAID REEL 257 PAGE 1371 WAS LOCATED PARALLEL WITH AND 33.00 FEET 
<br />SOUTHERLY WHEN MEASURED AT RIGHT ANGLES TO SAID CENTERLINE AS CALCULATED PER SAID DEED. RECORD DEED DISTANCES ALONG 
<br />THE WEST RIGHT-OF-WAY LINE OF COMMERCIAL STREET SE (38.83') AND THE EAST RIGHT-OF-WAY OF SUNNYSIDE ROAD SE (42.32') 
<br />WERE THEN HELD TO LOCATE THE ANGLE POINTS OF SAID DEED. FROM THESE POINTS, RECORD DEED DISTANCES WERE HELD TO 
<br />INTERSECT THE SAID SOUTH RIGHT-OF-WAY AS SHOWN. 
<br />THERE ARE SIGNIFICANT DIMENSION ISSUES SHOWN ON MCSR 29277 THAT HAS CREATED CONFUSION ABOUT HOW TO LOCATE THE 
<br />RIGHT-OF-WAY DEDICATION PER REEL 257 PAGE 1371. THIS SURVEY HOPES TO RESOLVE THAT CONFUSION. 
<br />HILFIKER LANE SE (NORTH RIGHT-OF-WAY PER REEL 269 PAGE 1016) 
<br />A REVIEW OF REEL 269 PAGE 1016 INDICATED THAT THE DEED CONTAINED CLOSURE ISSUES WHICH WERE PERPETUATED BY MCSR 29277. 
<br />A REVIEW OF THE DEED ALSO INDICATES THAT IT APPEARS TO HAVE BEEN BASED UPON MCSR 24502. HOWEVER, THERE APPEARS TO BE 
<br />DIMENSIONAL ISSUES BETWEEN SAID DEED AND SURVEY, SPECIFICALLY IN THE EAST/WEST DIMENSION BETWEEN THE RIGHT-OF-WAYS OF 
<br />SUNNYSIDE ROAD SE AND COMMERCIAL STREET SE. 
<br />THE NORTH RIGHT-OF-WAY LINE OF HILFlKER 
<br />LANE SE PER SAID REEL 269 PAGE 1016 WAS 
<br />LOCATED PARALLEL WITH AND 5.29 FEET 
<br />NORTHERLY WHEN MEASURED AT RIGHT ANGLES 
<br />TO THE ORIGINAL NORTH RIGHT-OF-WAY LINE 
<br />AS CALCULATED PER SAID DEED AS SHOWN. 
<br />RECORD DEED DISTANCES ALONG THE WEST 
<br />RIGHT-OF-WAY LINE OF COMMERCIAL STREET 
<br />SE (16.27') AND THE EAST RIGHT-OF-WAY OF 
<br />SUNNYSIDE ROAD SE (13.00') WERE THEN HELD 
<br />TO LOCATE THE ANGLE POINTS OF SAID DEED. 
<br />FROM THESE POINTS, RECORD DEED DISTANCES 
<br />WERE HELD TO INTERSECT THE SAID NORTH 
<br />RIGHT-OF-WAY AS SHOWN. 
<br />EXPIRES 12-31-21 
<br />Harper 
<br />HP Houf Peterson 
<br />Righellis Inc. 
<br />ENGINEERS •PLANNER S 
<br />LANDSCAPE ARCHITECTS* SURVEYORS 
<br />205 SE Spokane Street, Suite 200, Portland, OR 97202 
<br />phone: 503.221.1131 www.hhpr.com fax: 503.221.1171 
<br />SHEET 4 OF 5 arc 10/12/2021 suM—oe 
<br /> |