MONUMENT TABLE
<br />POINT NO.
<br />DESCRIPTION
<br />ORIGIN
<br />DEPTH
<br />53
<br />1 " IRON PIPE
<br />MC5R 5G 17
<br />FLUSH
<br />54
<br />3-1/2" BRASS DI5K IN CONCRETE
<br />MC5R 4409 F 10 1
<br />UP 1.01
<br />55
<br />3/8" X I -1 / 12" IRON BAR
<br />MCSR 5G 17
<br />FLUSH
<br />5G
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME H47, PAGE 82, BOTP
<br />FLU5H
<br />57
<br />3-1/2" BRASS DI5K IN CONCRETE
<br />MCSR 4409 K 102
<br />FLUSH
<br />102
<br />3/4" IF
<br />MCSR 5G 17
<br />FLUSH
<br />103
<br />112" IF
<br />MCSR 5G 17
<br />DOWN 0.9'
<br />104
<br />11211 IP
<br />MCSR 1 1 775
<br />FLUSH
<br />208
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />209
<br />1- 112" ALUMINUM CAP MARKED "PROJECT DELIVERY
<br />GROUP LLC", DESTROYED DURING CONSTRUCTION AND
<br />REPLACED AT TIED LOCATION WITH 2" ALUMINUM CAP
<br />MARKED "PROJECT DELIVERY GROUP"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />2 1 0
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />21 1
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME 1147, PAGE G2, BOTP
<br />FLUSH
<br />247
<br />3/4" IF
<br />MCSR 5G 17
<br />FLUSH
<br />248
<br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING"
<br />MCSR 34884
<br />FLUSH
<br />249
<br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING"
<br />MC5R 34884
<br />FLUSH
<br />250
<br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING"
<br />MCSR 34884
<br />FLUSH
<br />254
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />255
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />25G
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />257
<br />1- 112" ALUMINUM CAP MARKED "PROJECT DELIVERY
<br />GROUP LLC", DESTROYED DURING CONSTRUCTION AND
<br />REPLACED AT TIED LOCATION WITH 2" ALUMINUM CAP
<br />MARKED "PROJECT DELIVERY GROUP"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />258
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />259
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />2G5
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />309
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />310
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />31 1
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />3 1 2
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />3 1 3
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />3 1 4
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />3 1 5
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />3 1 G
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />3 1 7
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 1 9, BOTP
<br />FLUSH
<br />318
<br />1 -1 /2" ALUMINUM CAP MARKED "PROJECT DELIVERY
<br />GROUP LLC", DESTROYED DURING CONSTRUCTION AND
<br />REPLACED AT TIED LOCATION WITH 2" ALUMINUM CAP
<br />MARKED "PROJECT DELIVERY GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />3 1 9
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />9351
<br />5/8" IR WITH A YPC MARKED "MULTI/TECH ENG."
<br />PP201 5-OOG
<br />FLUSH
<br />9352
<br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING"
<br />PP201 7-OG4
<br />FLUSH
<br />9356
<br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING"
<br />PP201 7-OG4
<br />FLUSH
<br />9359
<br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING"
<br />MCSR 38967
<br />FLUSH
<br />I I G93
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />I I G9G
<br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC"
<br />VOLUME H47, PAGE G2, BOTP
<br />FLUSH
<br />I I G97
<br />5/8" REBAR WITH YPC MARKED "P D GROUP"
<br />VOLUME H48, PAGE 19, BOTP
<br />FLUSH
<br />TUSCANY HILLS N0.2
<br />A RE -PLAT OF TUSCANY HILLS LOT 24,
<br />LOCATED IN SOUTHWEST AND SOUTHEAST QUARTERS OF SECTION 17,
<br />TOGETHER WITH A PORTION OF THE SOUTHWEST QUARTER OF SECTION 17 ,
<br />TOWNSHIP 8 SOUTH, RANGE 3 WEST, WILLAMETTE MERIDIAN,
<br />CITY OF SALEM, MARION COUNTY, OREGON
<br />OCTOBER 14, 2021
<br />NARRATIVE:
<br />BELLA CRESTA PHASE 2
<br />VOLUME H47, PAGE 62,
<br />BOTF
<br />THE PURPOSE OF THIS SURVEY 15 TO REPLAT LOT 24, TUSCANY HILLS, A
<br />SUBDIVISION RECORDED IN MARION COUNTY BOOK OF TOWN PLATS ON JULY 27 ,
<br />2018 IN VOLUME H48, PAGE 19 AND BEING REFERENCED IN MCDR REEL 4104,
<br />PAGE 378.
<br />THE BA515 OF BEARINGS FOR LINES WITHIN THIS PLAT 15 NORTH 870 54'59"
<br />WEST, BETWEEN POINT NO. 57, SAID POINT BEING THE SOUTHEAST CORNER OF
<br />SECTION 17 TOWNSHIP 8 SOUTH, RANGE 3 WEST OF THE WILLAMETTE MERIDIAN,
<br />AND POINT NO. 54, SAID POINT BEING THE SOUTH QUARTER CORNER OF SAID
<br />SECTION 17. SAID MONUMENTS AND SECTION LINE ARE AS SHOWN ON THE PLAT
<br />OF VERONA HEIGHTS NO. 2, A SUBDIVISION RECORDED IN MARION COUNTY
<br />BOOK OF TOWN PLATS, VOLUME H47, PAGE 82. DISTANCES SHOWN ON TH15
<br />SURVEY ARE GROUND MEASUREMENTS AND WERE DETERMINED THROUGH A
<br />COMBINATION OF GPS AND TERRESTRIAL MEASUREMENTS U51NG A TRIMBLE SG
<br />TOTAL STATION AND TRIMBLE RG GPS ROVER AND BASE STATION.
<br />THE EAST LINE OF SAID LOT 24 WAS DETERMINED BY HOLDING POINT NO. 5G,
<br />SAID POINT BEING A 5/8" REBAR WITH A YELLOW PLASTIC CAP MARKED "P D
<br />GROUP LLC", SAID POINT AL50 BEING THE NORTHEAST CORNER OF LOT 8 OF
<br />SAID TUSCANY HILLS AND POINT NO. 55, SAID POINT BEING AN IRON BAR, SAID
<br />POINT AL50 BEING THE SOUTHEAST CORNER OF SAID LOT 24.
<br />THE SOUTH LINE OF SAID LOT 24 WAS DETERMINED BY HOLDING SAID POINT NO.
<br />55 AS DESCRIBED ABOVE, SAID POINT NO. 54 AS DESCRIBED ABOVE, POINT NO,
<br />53, SAID POINT BEING A I -INCH IRON PIPE, SAID POINT ALSO BEING THE
<br />SOUTHWEST CORNER OF SAID LOT 24.
<br />THE EASTERLY PORTION OF THE NORTHERLY LINE OF SAID LOT 24 WAS
<br />DETERMINED BY HOLDING MONUMENT NOS. 309, 310, 3 14, 3 1 G, 3 17, 319,
<br />AND I I G93 ALONG THE SOUTHERLY AND WESTERLY BOUNDARY OF LOTS I AND
<br />18 - 23 OF SAID TUSCANY HILLS.
<br />THE WESTERLY PORTION OF THE NORTHERLY LINE OF SAID LOT 24 WAS
<br />DETERMINED BY HOLDING MONUMENT NO5. I I G93, I I G97, I I G9G, 2 10, "D",
<br />"C", "B", 2(;5, AND "A"
<br />TO ESTABLISH THE LOCATION OF POINTS "A" AND "B", POINT NOS. 259 AND 2G5
<br />WERE HELD FOR BEARING AS SHOWN ON DETAIL "C-2" ON SHEET 2 HEREIN. THE
<br />LINE BETWEEN SAID MONUMENTS WAS EXTENDED TO THE WESTERLY
<br />RIGHT-OF-WAY OF EVANGEL15TA STREET AND TO THE EASTERLY LINE OF
<br />PP201 7-OG4. MONUMENTS WERE SET AT THE END OF SAID EXTENDED LINE AT
<br />POINTS "A" AND "B" AS SHOWN HEREIN.
<br />TO ESTABLISH THE LOCATION OF POINTS "C" AND "D", POINT NOS. 21 1 AND 254
<br />WERE HELD FOR BEARING. THE LINE BETWEEN SAID MONUMENTS WAS EXTENDED
<br />WESTERLY TO THE WESTERLY RIGHT-OF-WAY OF EVANGELISTA STREET AND
<br />TRIMMED AT THE WESTERLY RIGHT-OF-WAY OF VERONA STREET. MONUMENTS
<br />WERE SET AT THE ENDS OF SAID LINE ON SAID RIGHTS-OF-WAY AT POINTS "C" AND
<br />"D" AS SHOWN IN DETAILS "B-5" AND "C-5" ON SHEET 5 HEREIN.
<br />THE WESTERLY LINE OF THE LAND BEING SUBDIVIDED HEREIN WAS DETERMINED TO
<br />BE AT A DIFFERENT LOCATION THAN WAS SHOWN IN SAID BELLA CRESTA, PHASE 2
<br />AND SAID TUSCANY HILLS. THE FOLLOWING 15 A SUMMARY OF THE EVOLUTION OF
<br />SAID WESTERLY BOUNDARY LINE:
<br />1. THE SURVEYS AND PLATS THAT INCLUDE SAID WESTERLY LINE HAVE AGREED
<br />THE SOUTHERLY END OF THE LINE 15 POINT NO. 53, SAID POINT BEING A
<br />I -INCH IRON PIPE SET BY HERRICK AS PART OF MCSR 5G 17.
<br />2. WHEN RESOLVING THE BOUNDARY FOR SAID BELLA CRESTA PHASE 2,
<br />POINT NOS. 248 AND 249 WERE FOUND AND HELD AS THE
<br />SOUTHEASTERLY RIGHT-OF-WAY OF SKYLINE ROAD 5 AS SHOWN ON MCSR
<br />34884. ADDITIONALLY, POINT NO. 248 WAS HELD AS THE NORTH END OF
<br />THE WESTERLY LINE OF SAID BELLA CRESTA, PHASE 2, AL50 AS INDICATED
<br />ON MC5R 34884.
<br />3. PRIOR TO THE RECORDING OF SAID BELLA CRESTA PHASE 2 FINAL PLAT ON
<br />APRIL I G, 2015, HAMMAN (PLS 64202) PREPARED PARTITION NO.
<br />201 5-OOG. IT WAS RECORDED ON FEBRUARY 5, 2015 AND REFERENCED IN
<br />MCDR REEL 3670 AT PAGE 3 1 G. THIS PARTITION DIVIDED PROPERTY ON
<br />THE WEST SIDE OF SAID WEST LINE. HAMMAN HELD THE SAME 5CHULL
<br />MONUMENT AS WAS HELD IN SAID MCSR 34884 AND SAID BELLA CRESTA
<br />PHASE 2 FOR THE NORTH END OF SAID WEST LINE.
<br />4. IN 20) 7, HEPLER (PLS 245 1) PREPARED PARTITION PLAT NO. 201 7-OG4. IT
<br />WAS RECORDED ON DECEMBER 12, 2017 AND REFERENCED IN MCDR REEL
<br />4025 AT PAGE 2G2. IN PERFORMING THE FIELD WORK FOR TH15 PARTITION,
<br />HEPLER FOUND THE HERRICK MONUMENTS AT THE CENTERLINE OF SKYLINE
<br />ROAD 5. HE HELD MONUMENT NO. 19 AS SHOWN ON MCSR 5G 17, SAID
<br />MONUMENT SHOWN AS BEING N0045'W, 17.3G CHAINS FROM HERRICK
<br />POINT NO. 17, SAID POINT NO. 17 BEING THE SAME LOCATION AS POINT
<br />NO. 53 SHOWN HEREON. AS THIS MONUMENT WAS AN ORIGINAL
<br />MONUMENT IN THE SUBDIVISION OF THE JACOB DENCER ESTATE, IT 15
<br />LOTS 32-52
<br />(5HT 5)
<br />LOTS G9-78
<br />(5hT G)
<br />�����TM
<br />IN10
<br />TUSCANY H I LL5
<br />VOLUME H48, PAGE 19,
<br />BOTP
<br />LOTS 25-3 1 * 53-G8
<br />(5HT 4)
<br />CORRECT TO HOLD SAID MONUMENT NO. 19 AS THE NORTH END OF SAID
<br />WEST LINE.
<br />5. SAID TUSCANY HILLS PLAT PREPARED BY JAMES (PL5 77593) HELD THE
<br />SAME WESTERLY LINE AS WAS HELD IN SAID BELLA CRESTA PHASE 2 AND
<br />SAID PARTITION PLAT 201 5-OOG. HOWEVER, IT INCLUDED A DETAIL
<br />ACKNOWLEDGING THE WORK BY HEPLER IN SAID PARTITION PLAT 201 7-G4.
<br />TO RESOLVE SAID WESTERLY LINE OF THE LAND BEING SUBDIVIDED HEREON, THE
<br />FOLLOWING APPROACH WAS APPLIED:
<br />I . A LINE WAS DRAWN BETWEEN POINT NO. 53 AND POINT NO. 248 AS
<br />HAMMAN DID IN RESOLVING THE EAST LINE OF PARTITION PLAT 201 5-OOG.
<br />TH15 LINE LIES 0.04 -FEET WEST OF MONUMENT NO. 935 1, WHICH IS THE
<br />NORTHEAST CORNER OF PARCEL3 OF SAID PARTITION PLAT 201 5-OOG. AS
<br />A RESULT, THIS LINE 15 BEING HELD AS COINCIDENT WITH THE EAST LINE OF
<br />SAID PARTITION PLAT. SAID LINE WILL BE THE REAR PROPERTY LINE FOR
<br />LOTS 74 THROUGH 78, TUSCANY HILLS NO. 2, AS SHOWN HEREIN. A
<br />MONUMENT WAS SET AT THE INTERSECTION OF SAID LINE AND THE
<br />SOUTHERLY RIGHT-OF-WAY OF MILDRED LANE SOUTH, SAID RIGHT-OF-WAY
<br />BEING DEDICATED ON THIS PLAT. SAID SET MONUMENT BEING THE
<br />NORTHWESTERLY CORNER OF LOT 78, TUSCANY HILLS NO. 2, AS SHOWN
<br />HEREIN.
<br />2. THE RECORD BEARING FOR THE NORTH LINE OF PARCEL 3 IN PARTITION
<br />PLAT 201 5-OOG WAS ROTATED TO THE BA515 OF BEARING FOR TH15 PLAT.
<br />POINT NO. 9352 BEING HELD ON SAID LINE AND BEING THE POINT OF
<br />ROTATION. A LINE COINCIDENT WITH SAID NORTH LINE WAS EXTENDED TO
<br />THE EAST TO INTERSECT WITH SAID LINE BETWEEN POINT NO. 53 AND
<br />POINT NO. 248. THE INTERSECTION OF THESE TWO LINES FELL ON THE CAP
<br />OF POINT NO. 9351 50 A NEW MONUMENT WAS NOT SET. SAID LINE
<br />EXTENDED EAST FROM POINT NO. 9352 WAS HELD AS BEING A PORTION
<br />OF THE WESTERLY BOUNDARY OF THE LAND BEING SUBDIVIDED HEREON.
<br />3. A LINE DRAWN BETWEEN POINT NO. 53 AND POINT NO. 103 WAS HELD BY
<br />HELPER IN THE PREPARATION OF PARTITION PLAT 201 7-OG4 TO DETERMINE
<br />THE EASTERLY BOUNDARY OF SAID PLAT. THIS SAME LINE WAS HELD HEREIN
<br />NORTH OF POINT NO, 9352 TO ESTABLISH THE WESTERLY LINE OF THE
<br />LAND BEING SUBDIVIDED HEREIN. SAID LINE PASSES THROUGH SAID POINT.
<br />4. THE NORTHWEST CORNER OF THE LAND BEING SUBDIVIDED HEREON, SAID
<br />POINT AL50 BEING THE NORTHWEST CORNER OF LOT 49 OF TUSCANY
<br />HILLS NO. 2, WAS ESTABLISHED BY DRAWING A LINE BETWEEN POINT NO.
<br />259 AND POINT NO. 2G5. TH15 LINE WAS THEN EXTENDED UNTIL IT
<br />INTERSECTED THE LINE DRAWN BETWEEN POINT NO. 53 AND 103. SAID
<br />INTERSECTION BEING LABELED AS POINT "A"' HEREON, AND A MONUMENT
<br />WAS SET AT SAID LOCATION.
<br />IT HAS BEEN CONFIRMED THAT SAID LINE HELD BY HEPLER, SAID LINE BEING THE
<br />SAME LINE BETWEEN POINT NO. 53 AND POINT NO. 103, COINCIDES WITH THE
<br />CITY OF SALEM CORPORATE LIMITS AND THE DEED DESCRIPTION FOR THE LAND
<br />PURCHASED BY THE OWNER AND ENTITLED BY THE CITY OF SALEM TO BE
<br />SUBDIVIDED
<br />DEEDS WILL BE PREPARED TO CONVEY THE LAND LYING NORTH OF THE NORTH LINE
<br />OF LOT 49 TUSCANY HILLS NO.2 AS SHOWN HEREIN, AND BETWEEN THE EAST LINE
<br />OF PP201 7-OG4 AND THE WEST LINE OF BELLA CRESTA PHASE 2.
<br />7P
<br />EGISTERED
<br />PROFESSIONAL
<br />LAND SURVEYOR
<br />1�f-aZA- 2/4/2 2
<br />OREGON
<br />MAY 15, 2012
<br />KEITH WHISENHUNT
<br />62679
<br />RENEWS: JUNE 30, 2022
<br />CIVIL ENGINEERS
<br />LAND SURVEYORS
<br />PROJECT MANAGER5
<br />PLANNERS
<br />1 HOJ
<br />PROJECT DELIVERY GROUP, LLC
<br />200 HAWTHORNE AVE SUITE A-100
<br />SALEM, OR 97301
<br />503-3G4-4004
<br />PROJECT NO. 1505G-0 I
<br />SHEET 3 OF 6
<br />
|