Laserfiche WebLink
MONUMENT TABLE <br />POINT NO. <br />DESCRIPTION <br />ORIGIN <br />DEPTH <br />53 <br />1 " IRON PIPE <br />MC5R 5G 17 <br />FLUSH <br />54 <br />3-1/2" BRASS DI5K IN CONCRETE <br />MC5R 4409 F 10 1 <br />UP 1.01 <br />55 <br />3/8" X I -1 / 12" IRON BAR <br />MCSR 5G 17 <br />FLUSH <br />5G <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME H47, PAGE 82, BOTP <br />FLU5H <br />57 <br />3-1/2" BRASS DI5K IN CONCRETE <br />MCSR 4409 K 102 <br />FLUSH <br />102 <br />3/4" IF <br />MCSR 5G 17 <br />FLUSH <br />103 <br />112" IF <br />MCSR 5G 17 <br />DOWN 0.9' <br />104 <br />11211 IP <br />MCSR 1 1 775 <br />FLUSH <br />208 <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />209 <br />1- 112" ALUMINUM CAP MARKED "PROJECT DELIVERY <br />GROUP LLC", DESTROYED DURING CONSTRUCTION AND <br />REPLACED AT TIED LOCATION WITH 2" ALUMINUM CAP <br />MARKED "PROJECT DELIVERY GROUP" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />2 1 0 <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />21 1 <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME 1147, PAGE G2, BOTP <br />FLUSH <br />247 <br />3/4" IF <br />MCSR 5G 17 <br />FLUSH <br />248 <br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING" <br />MCSR 34884 <br />FLUSH <br />249 <br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING" <br />MC5R 34884 <br />FLUSH <br />250 <br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING" <br />MCSR 34884 <br />FLUSH <br />254 <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />255 <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />25G <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />257 <br />1- 112" ALUMINUM CAP MARKED "PROJECT DELIVERY <br />GROUP LLC", DESTROYED DURING CONSTRUCTION AND <br />REPLACED AT TIED LOCATION WITH 2" ALUMINUM CAP <br />MARKED "PROJECT DELIVERY GROUP" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />258 <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />259 <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />2G5 <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />309 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />310 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />31 1 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />3 1 2 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />3 1 3 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />3 1 4 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />3 1 5 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />3 1 G <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />3 1 7 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 1 9, BOTP <br />FLUSH <br />318 <br />1 -1 /2" ALUMINUM CAP MARKED "PROJECT DELIVERY <br />GROUP LLC", DESTROYED DURING CONSTRUCTION AND <br />REPLACED AT TIED LOCATION WITH 2" ALUMINUM CAP <br />MARKED "PROJECT DELIVERY GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />3 1 9 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />9351 <br />5/8" IR WITH A YPC MARKED "MULTI/TECH ENG." <br />PP201 5-OOG <br />FLUSH <br />9352 <br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING" <br />PP201 7-OG4 <br />FLUSH <br />9356 <br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING" <br />PP201 7-OG4 <br />FLUSH <br />9359 <br />5/8" IR WITH A YPC MARKED "AZIMUTH SURVEYING" <br />MCSR 38967 <br />FLUSH <br />I I G93 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />I I G9G <br />5/8" REBAR WITH YPC MARKED "P D GROUP LLC" <br />VOLUME H47, PAGE G2, BOTP <br />FLUSH <br />I I G97 <br />5/8" REBAR WITH YPC MARKED "P D GROUP" <br />VOLUME H48, PAGE 19, BOTP <br />FLUSH <br />TUSCANY HILLS N0.2 <br />A RE -PLAT OF TUSCANY HILLS LOT 24, <br />LOCATED IN SOUTHWEST AND SOUTHEAST QUARTERS OF SECTION 17, <br />TOGETHER WITH A PORTION OF THE SOUTHWEST QUARTER OF SECTION 17 , <br />TOWNSHIP 8 SOUTH, RANGE 3 WEST, WILLAMETTE MERIDIAN, <br />CITY OF SALEM, MARION COUNTY, OREGON <br />OCTOBER 14, 2021 <br />NARRATIVE: <br />BELLA CRESTA PHASE 2 <br />VOLUME H47, PAGE 62, <br />BOTF <br />THE PURPOSE OF THIS SURVEY 15 TO REPLAT LOT 24, TUSCANY HILLS, A <br />SUBDIVISION RECORDED IN MARION COUNTY BOOK OF TOWN PLATS ON JULY 27 , <br />2018 IN VOLUME H48, PAGE 19 AND BEING REFERENCED IN MCDR REEL 4104, <br />PAGE 378. <br />THE BA515 OF BEARINGS FOR LINES WITHIN THIS PLAT 15 NORTH 870 54'59" <br />WEST, BETWEEN POINT NO. 57, SAID POINT BEING THE SOUTHEAST CORNER OF <br />SECTION 17 TOWNSHIP 8 SOUTH, RANGE 3 WEST OF THE WILLAMETTE MERIDIAN, <br />AND POINT NO. 54, SAID POINT BEING THE SOUTH QUARTER CORNER OF SAID <br />SECTION 17. SAID MONUMENTS AND SECTION LINE ARE AS SHOWN ON THE PLAT <br />OF VERONA HEIGHTS NO. 2, A SUBDIVISION RECORDED IN MARION COUNTY <br />BOOK OF TOWN PLATS, VOLUME H47, PAGE 82. DISTANCES SHOWN ON TH15 <br />SURVEY ARE GROUND MEASUREMENTS AND WERE DETERMINED THROUGH A <br />COMBINATION OF GPS AND TERRESTRIAL MEASUREMENTS U51NG A TRIMBLE SG <br />TOTAL STATION AND TRIMBLE RG GPS ROVER AND BASE STATION. <br />THE EAST LINE OF SAID LOT 24 WAS DETERMINED BY HOLDING POINT NO. 5G, <br />SAID POINT BEING A 5/8" REBAR WITH A YELLOW PLASTIC CAP MARKED "P D <br />GROUP LLC", SAID POINT AL50 BEING THE NORTHEAST CORNER OF LOT 8 OF <br />SAID TUSCANY HILLS AND POINT NO. 55, SAID POINT BEING AN IRON BAR, SAID <br />POINT AL50 BEING THE SOUTHEAST CORNER OF SAID LOT 24. <br />THE SOUTH LINE OF SAID LOT 24 WAS DETERMINED BY HOLDING SAID POINT NO. <br />55 AS DESCRIBED ABOVE, SAID POINT NO. 54 AS DESCRIBED ABOVE, POINT NO, <br />53, SAID POINT BEING A I -INCH IRON PIPE, SAID POINT ALSO BEING THE <br />SOUTHWEST CORNER OF SAID LOT 24. <br />THE EASTERLY PORTION OF THE NORTHERLY LINE OF SAID LOT 24 WAS <br />DETERMINED BY HOLDING MONUMENT NOS. 309, 310, 3 14, 3 1 G, 3 17, 319, <br />AND I I G93 ALONG THE SOUTHERLY AND WESTERLY BOUNDARY OF LOTS I AND <br />18 - 23 OF SAID TUSCANY HILLS. <br />THE WESTERLY PORTION OF THE NORTHERLY LINE OF SAID LOT 24 WAS <br />DETERMINED BY HOLDING MONUMENT NO5. I I G93, I I G97, I I G9G, 2 10, "D", <br />"C", "B", 2(;5, AND "A" <br />TO ESTABLISH THE LOCATION OF POINTS "A" AND "B", POINT NOS. 259 AND 2G5 <br />WERE HELD FOR BEARING AS SHOWN ON DETAIL "C-2" ON SHEET 2 HEREIN. THE <br />LINE BETWEEN SAID MONUMENTS WAS EXTENDED TO THE WESTERLY <br />RIGHT-OF-WAY OF EVANGEL15TA STREET AND TO THE EASTERLY LINE OF <br />PP201 7-OG4. MONUMENTS WERE SET AT THE END OF SAID EXTENDED LINE AT <br />POINTS "A" AND "B" AS SHOWN HEREIN. <br />TO ESTABLISH THE LOCATION OF POINTS "C" AND "D", POINT NOS. 21 1 AND 254 <br />WERE HELD FOR BEARING. THE LINE BETWEEN SAID MONUMENTS WAS EXTENDED <br />WESTERLY TO THE WESTERLY RIGHT-OF-WAY OF EVANGELISTA STREET AND <br />TRIMMED AT THE WESTERLY RIGHT-OF-WAY OF VERONA STREET. MONUMENTS <br />WERE SET AT THE ENDS OF SAID LINE ON SAID RIGHTS-OF-WAY AT POINTS "C" AND <br />"D" AS SHOWN IN DETAILS "B-5" AND "C-5" ON SHEET 5 HEREIN. <br />THE WESTERLY LINE OF THE LAND BEING SUBDIVIDED HEREIN WAS DETERMINED TO <br />BE AT A DIFFERENT LOCATION THAN WAS SHOWN IN SAID BELLA CRESTA, PHASE 2 <br />AND SAID TUSCANY HILLS. THE FOLLOWING 15 A SUMMARY OF THE EVOLUTION OF <br />SAID WESTERLY BOUNDARY LINE: <br />1. THE SURVEYS AND PLATS THAT INCLUDE SAID WESTERLY LINE HAVE AGREED <br />THE SOUTHERLY END OF THE LINE 15 POINT NO. 53, SAID POINT BEING A <br />I -INCH IRON PIPE SET BY HERRICK AS PART OF MCSR 5G 17. <br />2. WHEN RESOLVING THE BOUNDARY FOR SAID BELLA CRESTA PHASE 2, <br />POINT NOS. 248 AND 249 WERE FOUND AND HELD AS THE <br />SOUTHEASTERLY RIGHT-OF-WAY OF SKYLINE ROAD 5 AS SHOWN ON MCSR <br />34884. ADDITIONALLY, POINT NO. 248 WAS HELD AS THE NORTH END OF <br />THE WESTERLY LINE OF SAID BELLA CRESTA, PHASE 2, AL50 AS INDICATED <br />ON MC5R 34884. <br />3. PRIOR TO THE RECORDING OF SAID BELLA CRESTA PHASE 2 FINAL PLAT ON <br />APRIL I G, 2015, HAMMAN (PLS 64202) PREPARED PARTITION NO. <br />201 5-OOG. IT WAS RECORDED ON FEBRUARY 5, 2015 AND REFERENCED IN <br />MCDR REEL 3670 AT PAGE 3 1 G. THIS PARTITION DIVIDED PROPERTY ON <br />THE WEST SIDE OF SAID WEST LINE. HAMMAN HELD THE SAME 5CHULL <br />MONUMENT AS WAS HELD IN SAID MCSR 34884 AND SAID BELLA CRESTA <br />PHASE 2 FOR THE NORTH END OF SAID WEST LINE. <br />4. IN 20) 7, HEPLER (PLS 245 1) PREPARED PARTITION PLAT NO. 201 7-OG4. IT <br />WAS RECORDED ON DECEMBER 12, 2017 AND REFERENCED IN MCDR REEL <br />4025 AT PAGE 2G2. IN PERFORMING THE FIELD WORK FOR TH15 PARTITION, <br />HEPLER FOUND THE HERRICK MONUMENTS AT THE CENTERLINE OF SKYLINE <br />ROAD 5. HE HELD MONUMENT NO. 19 AS SHOWN ON MCSR 5G 17, SAID <br />MONUMENT SHOWN AS BEING N0045'W, 17.3G CHAINS FROM HERRICK <br />POINT NO. 17, SAID POINT NO. 17 BEING THE SAME LOCATION AS POINT <br />NO. 53 SHOWN HEREON. AS THIS MONUMENT WAS AN ORIGINAL <br />MONUMENT IN THE SUBDIVISION OF THE JACOB DENCER ESTATE, IT 15 <br />LOTS 32-52 <br />(5HT 5) <br />LOTS G9-78 <br />(5hT G) <br />�����TM <br />IN10 <br />TUSCANY H I LL5 <br />VOLUME H48, PAGE 19, <br />BOTP <br />LOTS 25-3 1 * 53-G8 <br />(5HT 4) <br />CORRECT TO HOLD SAID MONUMENT NO. 19 AS THE NORTH END OF SAID <br />WEST LINE. <br />5. SAID TUSCANY HILLS PLAT PREPARED BY JAMES (PL5 77593) HELD THE <br />SAME WESTERLY LINE AS WAS HELD IN SAID BELLA CRESTA PHASE 2 AND <br />SAID PARTITION PLAT 201 5-OOG. HOWEVER, IT INCLUDED A DETAIL <br />ACKNOWLEDGING THE WORK BY HEPLER IN SAID PARTITION PLAT 201 7-G4. <br />TO RESOLVE SAID WESTERLY LINE OF THE LAND BEING SUBDIVIDED HEREON, THE <br />FOLLOWING APPROACH WAS APPLIED: <br />I . A LINE WAS DRAWN BETWEEN POINT NO. 53 AND POINT NO. 248 AS <br />HAMMAN DID IN RESOLVING THE EAST LINE OF PARTITION PLAT 201 5-OOG. <br />TH15 LINE LIES 0.04 -FEET WEST OF MONUMENT NO. 935 1, WHICH IS THE <br />NORTHEAST CORNER OF PARCEL3 OF SAID PARTITION PLAT 201 5-OOG. AS <br />A RESULT, THIS LINE 15 BEING HELD AS COINCIDENT WITH THE EAST LINE OF <br />SAID PARTITION PLAT. SAID LINE WILL BE THE REAR PROPERTY LINE FOR <br />LOTS 74 THROUGH 78, TUSCANY HILLS NO. 2, AS SHOWN HEREIN. A <br />MONUMENT WAS SET AT THE INTERSECTION OF SAID LINE AND THE <br />SOUTHERLY RIGHT-OF-WAY OF MILDRED LANE SOUTH, SAID RIGHT-OF-WAY <br />BEING DEDICATED ON THIS PLAT. SAID SET MONUMENT BEING THE <br />NORTHWESTERLY CORNER OF LOT 78, TUSCANY HILLS NO. 2, AS SHOWN <br />HEREIN. <br />2. THE RECORD BEARING FOR THE NORTH LINE OF PARCEL 3 IN PARTITION <br />PLAT 201 5-OOG WAS ROTATED TO THE BA515 OF BEARING FOR TH15 PLAT. <br />POINT NO. 9352 BEING HELD ON SAID LINE AND BEING THE POINT OF <br />ROTATION. A LINE COINCIDENT WITH SAID NORTH LINE WAS EXTENDED TO <br />THE EAST TO INTERSECT WITH SAID LINE BETWEEN POINT NO. 53 AND <br />POINT NO. 248. THE INTERSECTION OF THESE TWO LINES FELL ON THE CAP <br />OF POINT NO. 9351 50 A NEW MONUMENT WAS NOT SET. SAID LINE <br />EXTENDED EAST FROM POINT NO. 9352 WAS HELD AS BEING A PORTION <br />OF THE WESTERLY BOUNDARY OF THE LAND BEING SUBDIVIDED HEREON. <br />3. A LINE DRAWN BETWEEN POINT NO. 53 AND POINT NO. 103 WAS HELD BY <br />HELPER IN THE PREPARATION OF PARTITION PLAT 201 7-OG4 TO DETERMINE <br />THE EASTERLY BOUNDARY OF SAID PLAT. THIS SAME LINE WAS HELD HEREIN <br />NORTH OF POINT NO, 9352 TO ESTABLISH THE WESTERLY LINE OF THE <br />LAND BEING SUBDIVIDED HEREIN. SAID LINE PASSES THROUGH SAID POINT. <br />4. THE NORTHWEST CORNER OF THE LAND BEING SUBDIVIDED HEREON, SAID <br />POINT AL50 BEING THE NORTHWEST CORNER OF LOT 49 OF TUSCANY <br />HILLS NO. 2, WAS ESTABLISHED BY DRAWING A LINE BETWEEN POINT NO. <br />259 AND POINT NO. 2G5. TH15 LINE WAS THEN EXTENDED UNTIL IT <br />INTERSECTED THE LINE DRAWN BETWEEN POINT NO. 53 AND 103. SAID <br />INTERSECTION BEING LABELED AS POINT "A"' HEREON, AND A MONUMENT <br />WAS SET AT SAID LOCATION. <br />IT HAS BEEN CONFIRMED THAT SAID LINE HELD BY HEPLER, SAID LINE BEING THE <br />SAME LINE BETWEEN POINT NO. 53 AND POINT NO. 103, COINCIDES WITH THE <br />CITY OF SALEM CORPORATE LIMITS AND THE DEED DESCRIPTION FOR THE LAND <br />PURCHASED BY THE OWNER AND ENTITLED BY THE CITY OF SALEM TO BE <br />SUBDIVIDED <br />DEEDS WILL BE PREPARED TO CONVEY THE LAND LYING NORTH OF THE NORTH LINE <br />OF LOT 49 TUSCANY HILLS NO.2 AS SHOWN HEREIN, AND BETWEEN THE EAST LINE <br />OF PP201 7-OG4 AND THE WEST LINE OF BELLA CRESTA PHASE 2. <br />7P <br />EGISTERED <br />PROFESSIONAL <br />LAND SURVEYOR <br />1�f-aZA- 2/4/2 2 <br />OREGON <br />MAY 15, 2012 <br />KEITH WHISENHUNT <br />62679 <br />RENEWS: JUNE 30, 2022 <br />CIVIL ENGINEERS <br />LAND SURVEYORS <br />PROJECT MANAGER5 <br />PLANNERS <br />1 HOJ <br />PROJECT DELIVERY GROUP, LLC <br />200 HAWTHORNE AVE SUITE A-100 <br />SALEM, OR 97301 <br />503-3G4-4004 <br />PROJECT NO. 1505G-0 I <br />SHEET 3 OF 6 <br />