Laserfiche WebLink
0' 40' 80' <br />SCALE: 1 INCH = 40 FEET <br />—30' <br />SHEET INDEX <br />SHEET 1 - CASE N0. PLA21-24 <br />SHEET 2 - CASE N0. PLA21-25 <br />0 <br />�0 <br />ocr <br />MONUMENT LIST o Q <br />u- <br />m IP <br />1 (6) <br />N <br />0 <br />B IP <br />1" (6) <br />� <br />rn <br />C IR <br />5/8", DOWN <br />0.4' <br />(8) <br />D IR <br />5/8", DOWN <br />0.3' <br />(8) <br />BEARS <br />S89'53'46"W, <br />0.24' FROM <br />LANSING <br />AVENUE RIGHT OF WAY <br />E IR <br />5/8", DOWN <br />0.6' <br />(8) <br />F IR <br />5/8", DOWN <br />1.2' <br />(8) <br />G IR <br />5/8" (7) <br />WYPC <br />Z <br />H IP <br />1/2", DOWN <br />0.8' <br />(2) <br />1 IP <br />1/2" (4) <br />w <br />J IP <br />1/2" (4) <br />PLA <br />PROPERTY LINE ADJUSTMENT <br />K IP <br />1/2", DOWN <br />0.3' <br />(1) <br />L IP <br />2", DOWN 0.8' <br />(6) <br />® <br />SURVEY/DEED REFERENCES <br />NOTE: ALL REFERENCES ARE FROM <br />MARION COUNTY RECORDS <br />(1) MCSR 15349 <br />(2) MCSR 23119 <br />(3) MCSR 25784 <br />(4) SILVER PARK ADDITION <br />VOLUME 20, PAGE 4, B.O.T.P. <br />(5) STARR SUBDIVISION <br />VOLUME 30, PAGE 12 B.O.T.P. <br />(6) STARR SUBDIVISION NO. 2 <br />VOLUME 30, PAGE 27 B.O.T.P. <br />(7) DUVALL SUBDIVISION <br />VOLUME 31, PAGE 34 B.O.T.P. <br />(8) DIANE SUBDIVISION <br />VOLUME 35, PAGE 46 B.O.T.P. <br />MCSR 39609 <br />rn rn 00 <br />0 <br />[N89'18'E 196.18'C(8)] <br />N89°53'46"E 196.09' <br />t N 00'31 ' 39"E 30.00' <br />- - [NO'02'45"W 30'(8)]- <br />Lo <br />ON <br />PROPERTY A <br />REEL 4610, PAGE 232 <br />00 CHURCH <br />o TIS'T <br />00 CARITAL R PON OF %8 <br />ME 607,RAGE4 <br />'VOLUME SF <br />N <br />L <br />N <br />0 <br />M <br />� rn <br />� <br />rn <br />o <br />w� <br />00 D <br />0) w <br />W <br />W <br />w <br />N <br />v� <br />0) <br />or) <br />Q <br />0< <br />O <br />n <br />IRON ROD <br />1 <br />0 O <br />0 <br />Z <br />IP <br />O <br />0 <br />WYPC <br />Z <br />ziI <br />Z <br />z <br />CURVE # <br />w <br />0 <br />0 <br />DELTA <br />o^ <br />Q <br />o �, <br />o <br />o <br />w� <br />00 D <br />0) w <br />1-0 <br />n <br />(� c <br />0 <br />0 <br />:� o <br />H2�- <br />Q <br />0< <br />ou <br />z <br />J LL_ <br />IRON ROD <br />1 <br />! t <br />Z <br />�--30' <br />1 <br />0 <br />LANSING AVENUE <br />EAST RIGHT OF WAY <br />RECORD OF SURVEY <br />FOR C.O.S. CASE NUMBER PLA21-24 <br />IN THE NE 1/4 OF SECTION 13, T.7S., R.3W., W.M. <br />CITY OF SALEM, MARION COUNTY, OREGON <br />DATE: JANUARY 21, 2022 <br />gp1V151ON <br />O [N89'18'E 120.00'C(8)] Su <br />N <br />_10 I O <br />S �'RQ'dR"F 11Q R7' <br />PROPERTY B <br />REEL 4610, PAGE 232 <br />BAR -VAST CHURCH <br />C p,R 1T A P ORTRSI ON OF <br />E 7'20 <br />VOLUME 443, <br />06541F <br />1 <br />SORENSON CT. <br />N89053'46"E 416.59' <br />N89'53'46"E 386.59' <br />[S89'18'W 386.59'C(1)] <br />N89'47'00"E 275.00' [275'(1)] <br />245.00' <br />T1ST CHURCH <br />CAR4TAL 8565, RAGE X89 <br />VOLUME <br />S89'47'00"W 275.00' [275'(1)] <br />245.00' <br />304.14' [S89.13W 304.14'(6)] <br />STARR SUBDIVISION <br />NO. 2 <br />NARRATIVE 1 <br />[S89'18'W 541.83'C(1)] <br />N89'52'40"E 541.27'_ <br />N89'52'40"E 511.27' <br />[S89'18'W 511.83C(1)] <br />in <br />EXHIBIT 'C' OF <br />REEL 4610, PAGE 232 <br />150,889 SF <br />S89°47'00"W 511.64' <br />[S89.13'W 512.03'C(1)] <br />S89'47100"W 541.64' <br />[S89°13'W 542.03'C(1)] <br />THE PURPOSE OF THIS SURVEY IS TO COMPLETE TWO <br />PROPERTY LINE ADJUSTMENT SURVEYS BETWEEN <br />PROPERTIES OWNED BY CAPITAL BAPTIST CHURCH PER CITY <br />OF SALEM PROPERTY LINE ADJUSTMENT CASE NUMBERS <br />PLA21-24 AND PLA21-25. <br />FOR MY BASIS OF BEARINGS, I HELD TE OREGON <br />COORDINATE REFERENCE SYSTEM "SALE ZONE, <br />NAD83(2011), EPOCH 2010.00, ESTABLISHED BY A TRIMBLE <br />R12i GNSS RECEIVER UTILIZING THE OREGON REAL-TIME <br />GNSS NETWORK BETWEEN MONUMENTS 'B' AND 'K' AS <br />SHOWN. <br />THE NORTH LINE OF SUBJECT PROPERTY, BEING ALSO THE <br />SOUTH LINE OF SORENSON COURT, WAS RESOLVED BY <br />HOLDING RECORD GEOMETRY, ALONG WITH MONUMENTS 'C', <br />MCSR 39609 <br />CURVE TABLE <br />CURVE # <br />i LENGTH <br />RADIUS <br />DELTA <br />CH. BEARING <br />CH. LEN. <br />Cl <br />27.14' <br />35.00' <br />44'25'36" <br />N67'40'58"E <br />26.46' <br />RECORD PER (8) [35.00'] [S67 -05'30"W] [26.46'] <br />Ponos D� ANE N <br />R �5, vgo�\ s�p <br />S �LOT 5 <br />[S89'18'W 85 21'(1)] <br />G� <br />u v ASL LEGEND <br />p�v�S10� • FOUND MONUMENT AS NOTED <br />518 WITHIN 0.20 OF SURFACE & <br />LOT 2 HELD UNLESS NOTED OTHERWISE <br />N89'36'46"E 85.16' © BLOCK 1 » <br />r , <br />S89'08'15"E 15.00' 1 <br />[N89'180E 15.09'(3)] <br />[15.09'(3)] <br />0 <br />u <br />0 <br />0 <br />LINE TO BET <br />REMOVED <br />0 <br />u <br />N j 83.70' [83.70'(4)] J <br />O <br />© 266.64' <br />1. <br />207.50' [N89.13'E 207.52'C(5)] <br />STARR SUBDIVISION <br />'D', 'E' AND 'F', PER (8). A CHORD LENGTH OF 26.46 FEET <br />WAS HELD PER (8) TO RESOLVE THE EASTERLY END OF <br />CURVE 'Cl'. THE REMAINDER OF THE NORTH LINE WAS <br />RESOLVED BY HOLDING SAID EASTERLY END OF 'Cl', <br />MONUMENT 'G' AND 90.00 FEET NORTH OF MONUMENT 'H' <br />PER (8) AND (3). <br />THE EAST LINE WAS RESOLVED BY HOLDING MONUMENTS 'H', <br />'K' AND 83.70 FEET WESTERLY OF MONUMENT 'J' PER (4). <br />THE SOUTH LINE WAS RESOLVED BY HOLDING MONUMENTS <br />'B', 'L' AND 'K' PER (5) AND (6). <br />THE WEST LINE, BEING ALSO THE WEST LINE OF <br />FAIRGROUND GARDEN WAS RESOLVED BY HOLDING PARALLEL <br />WITH AND 30.00 FEET WEST OF THE EAST RIGHT OF WAY <br />0 <br />R P ARK <br />s\L�E ON <br />Ap D <br />OF LANSING AVENUE PER (1) AND (3). THE <br />EAST RIGHT OF WAY OF LANSING AVENUE <br />WAS RESOLVED BY HOLDING MONUMENTS <br />'A', 'B' AND 'C' PER (6) AND (8). <br />80.27' [80.27'(4)] <br />0 <br />REGISTERED <br />PROFESSIONAL <br />LAND SURVEYOR <br />1 <br />i <br />OREGON <br />SEPTEMBER 12, 2017 <br />STEVEN LEE HOWELL <br />91569 <br />RENEWS: 6-30-2023 <br />O <br />SET 5/8 x30 IR WYPC MARKED <br />"HOWELL LS 91569", FLUSH <br />S�L� �-� ON <br />[DATA(#)] <br />RECORD DATA & REFERENCE <br />C) 0 <br />AD <br />cn z <br />Q 0) <br />C(#) <br />CALCULATED DATA & REFERENCE <br />U)0 <br />SF <br />SQUARE FEET <br />�I <br />Q <br />a- <br />IR <br />IRON ROD <br />o <br />ui� <br />M <br />Z <br />IP <br />IRON PIPE <br />0 <br />WYPC <br />WITH YELLOW PLASTIC CAP <br />Q <br />w <br />MCSR <br />MARION COUNTY SURVEY RECORDS <br />w <br />z <br />WATSON AVENUE <br />PLA <br />PROPERTY LINE ADJUSTMENT <br />C.O.S. <br />CITY OF SALEM <br />0 <br />CH <br />CHORD <br />® <br />MONUMENT REFERENCE <br />u <br />N j 83.70' [83.70'(4)] J <br />O <br />© 266.64' <br />1. <br />207.50' [N89.13'E 207.52'C(5)] <br />STARR SUBDIVISION <br />'D', 'E' AND 'F', PER (8). A CHORD LENGTH OF 26.46 FEET <br />WAS HELD PER (8) TO RESOLVE THE EASTERLY END OF <br />CURVE 'Cl'. THE REMAINDER OF THE NORTH LINE WAS <br />RESOLVED BY HOLDING SAID EASTERLY END OF 'Cl', <br />MONUMENT 'G' AND 90.00 FEET NORTH OF MONUMENT 'H' <br />PER (8) AND (3). <br />THE EAST LINE WAS RESOLVED BY HOLDING MONUMENTS 'H', <br />'K' AND 83.70 FEET WESTERLY OF MONUMENT 'J' PER (4). <br />THE SOUTH LINE WAS RESOLVED BY HOLDING MONUMENTS <br />'B', 'L' AND 'K' PER (5) AND (6). <br />THE WEST LINE, BEING ALSO THE WEST LINE OF <br />FAIRGROUND GARDEN WAS RESOLVED BY HOLDING PARALLEL <br />WITH AND 30.00 FEET WEST OF THE EAST RIGHT OF WAY <br />0 <br />R P ARK <br />s\L�E ON <br />Ap D <br />OF LANSING AVENUE PER (1) AND (3). THE <br />EAST RIGHT OF WAY OF LANSING AVENUE <br />WAS RESOLVED BY HOLDING MONUMENTS <br />'A', 'B' AND 'C' PER (6) AND (8). <br />80.27' [80.27'(4)] <br />0 <br />REGISTERED <br />PROFESSIONAL <br />LAND SURVEYOR <br />1 <br />i <br />OREGON <br />SEPTEMBER 12, 2017 <br />STEVEN LEE HOWELL <br />91569 <br />RENEWS: 6-30-2023 <br />'—'R <br />PARK <br />:�. <br />S�L� �-� ON <br />w <br />F-- D <br />C) 0 <br />AD <br />cn z <br />N L <br />K) �- <br />M <br />1'7 N <br />Q <br />3� <br />M <br />30' I 30' <br />- <br />coo <br />_ <br />LnO <br />NNo <br />to <br />z <br />WATSON AVENUE <br />0 <br />N z <br />O <br />C) <br />_ <br />N89'55'09"E <br />163.97' _ <br />u <br />N j 83.70' [83.70'(4)] J <br />O <br />© 266.64' <br />1. <br />207.50' [N89.13'E 207.52'C(5)] <br />STARR SUBDIVISION <br />'D', 'E' AND 'F', PER (8). A CHORD LENGTH OF 26.46 FEET <br />WAS HELD PER (8) TO RESOLVE THE EASTERLY END OF <br />CURVE 'Cl'. THE REMAINDER OF THE NORTH LINE WAS <br />RESOLVED BY HOLDING SAID EASTERLY END OF 'Cl', <br />MONUMENT 'G' AND 90.00 FEET NORTH OF MONUMENT 'H' <br />PER (8) AND (3). <br />THE EAST LINE WAS RESOLVED BY HOLDING MONUMENTS 'H', <br />'K' AND 83.70 FEET WESTERLY OF MONUMENT 'J' PER (4). <br />THE SOUTH LINE WAS RESOLVED BY HOLDING MONUMENTS <br />'B', 'L' AND 'K' PER (5) AND (6). <br />THE WEST LINE, BEING ALSO THE WEST LINE OF <br />FAIRGROUND GARDEN WAS RESOLVED BY HOLDING PARALLEL <br />WITH AND 30.00 FEET WEST OF THE EAST RIGHT OF WAY <br />0 <br />R P ARK <br />s\L�E ON <br />Ap D <br />OF LANSING AVENUE PER (1) AND (3). THE <br />EAST RIGHT OF WAY OF LANSING AVENUE <br />WAS RESOLVED BY HOLDING MONUMENTS <br />'A', 'B' AND 'C' PER (6) AND (8). <br />80.27' [80.27'(4)] <br />0 <br />REGISTERED <br />PROFESSIONAL <br />LAND SURVEYOR <br />1 <br />i <br />OREGON <br />SEPTEMBER 12, 2017 <br />STEVEN LEE HOWELL <br />91569 <br />RENEWS: 6-30-2023 <br />