My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11189694
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
11189694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 1:46:22 PM
Creation date
8/11/2022 11:14:18 AM
Metadata
Fields
Template:
Permits
Permit Address
3495 BERGMAN PL SE
Permit City
Salem
Permit Number
555-21-010192-PRMT
Parcel Number
082W30 00500
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-21-010192-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555003821583 <br /> • <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued 5f2122 Expiration date':'5/2/23 <br /> Work description MAJ REP 3 BORM' • <br /> 9 vy <br /> Special Requirements <br /> Stake out required: No <br /> Pump to drainfield reqd: N/A Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> -Properly decommission the old septic tank and submit appropriate documentation <br /> •A failing system must be repaired as soon as possible.Should the repair of this system be delayed,the <br /> property owner must notify the agent and provide the reasons for delay,and propose a different completion date. <br /> Delays may be cause for formal enforcement action,which may result in civil penalty assessments. <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the <br /> distribution unit.It must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from <br /> one end of the pipe to the other. In addition,there must be a minimum difference of 8 inches between the invert of <br /> the septic tank outlet and either the invert of the header to the distribution pipe of the highest lateral in a serial <br /> distribution field or the invert of the header pipe to the distribution pipes of an equal distribution absorption field. • <br /> 5/2/22:8:59:22AM ONS_OnsitePermit pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.