My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11190174
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
11190174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 1:43:53 PM
Creation date
8/11/2022 4:44:23 PM
Metadata
Fields
Template:
Permits
Permit Address
335 JANICE CT
Permit City
Detroit
Permit Number
555-21-011479-PRMT
Parcel Number
105E02DA07400
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Septic Permit 555-21-011479-PRMT Page 2 of 3 <br /> Date Certifrcate tssuetl :(7/28/2022 <br /> k <br /> Wor Description NEW)NSTALL FOR 4 BDRM RES <br /> *-m .,,... _`3_ :..e .... n.—•Ti"...... ._ ..f ... .,,;is j .-,v..J.t n i�4e'!'3. .., v,.....x#- .3 .., < ..Cw.�,_t ..,, ..r �#= _.,,...._ .,. .. ,. .. <br /> a a f Approua[ : - = y <br /> •This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be installed by a person certified <br /> by the system manufacturer in accordance with OAR 340-071-0600 and 0650.See Alternative Treatment Technology rules at OAR <br /> 340-071-0345. <br /> •In addition to the As-Built and Materials List, a Start-Up checklist from the ATT maintenance provider is required to Final this <br /> permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the manufacturer to inspect, <br /> adjust and maintain the onsite system.The maintenance provider must submit an annual report and annual evaluation fee. <br /> •Gravelless absorption method rules at OAR 340-071-0290(6). Pressurized distribution required w/distribution piping perforated <br /> with 1/8 inch diameter orifices on maximum 2-foot centers at the 12 o'clock position and at least a 2-foot residual head at the distal <br /> orifice. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain access to septic tank for pumping and <br /> service. <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent, including any changes made by the agent. <br /> All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications without approval <br /> by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical, or other codes.An electrical permit and inspection from the Department of Consumer and Business Services, Building <br /> Codes Division,or the municipality with jurisdiction, is required for pump wiring installation. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion (CSC)or rules for authorization notices, alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160, 340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 7/28/22:9:45:46AM ONS_OnsiteCSC pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.