Laserfiche WebLink
Septic Permit 555-21-011477-PRMT Page 2 of 3 <br /> Date Gercate Issued G° 128/2022 <br /> Work Desorrptron NN ATT INSTALL for4 BDRM FC} _ k <br /> x a � <br /> ,:,90154itiOnf:App:rovglti <br /> •This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be installed by a person certified <br /> by the system manufacturer in accordance with OAR 340-071-0600 and 0650. See Alternative Treatment Technology rules at OAR <br /> 340-071-0345. <br /> •In addition to the As-Built and Materials List, a Start-Up checklist from the ATT maintenance provider is required to Final this <br /> permit. <br /> •Gravelless absorption method rules at OAR 340-071-0290(6). Pressurized distribution required w/distribution piping perforated <br /> with 1/8 inch diameter orifices on maximum 2-foot centers at the 12 o'clock position and at least a 2-foot residual head at the distal <br /> orifice. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical, or other codes.An electrical permit and inspection from the Department of Consumer and Business Services, Building <br /> Codes Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> •Gravelless absorption method rules at OAR 340-071-0290(6). Pressurized distribution required w/distribution piping perforated <br /> with 1/8 inch diameter orifices on maximum 2-foot centers at the 12 o'clock position and at least a 2-foot residual head at the distal <br /> orifice. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling, cutting, or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion (CSC)or rules for authorization notices, alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160, 340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill (cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 7/28/22:10:12:17AM ONS_OnsiteCSCjr <br />