Laserfiche WebLink
2-YEAR AX20RT SERVICE CONTRACT <br /> PRESSURE DISTRIBUTION DRAIN FIELD <br /> SCHEDULE A <br /> 1. System Maintenance and Servicing performed SEMI-ANNUALLY <br /> A. Maintain Processing Tank. <br /> 1. Inspect/clean biotube <br /> 2. Measure:sludge and scum <br /> 3. Check tank for pumping <br /> B. Maintain AX20 filter <br /> 1. Record ETM's and event counters <br /> 2. Activate all floats <br /> 3. Verify all timer settings <br /> 4. Record motor amps <br /> 5. Inspect/clean laterals/orifices <br /> 6. Inspect textile media <br /> 7. Check/record squirt height <br /> 8. Check splice box <br /> 9. Check/record clarity(turbidity) <br /> 10. Check for odor(sniff) <br /> 11. Check for oily film(visual inside tank) <br /> 12. Check for foam(visual inside tank) <br /> 13. Check/record pH <br /> C. Maintain disposal field pump Basin/Inspect disposal field <br /> 1. .Check basin pump intake screen <br /> 2. Check basin floats for proper operation <br /> 3. Service disposal field's pressure lines annually <br /> 4. Visually and olfactory inspect disposal field surface for ponding <br /> 5. Check liquid level in disposal field's monitoring ports. <br /> D: Telemetry Monitoring <br /> I. Telemetry control panel downloads data to VeriComm <br /> Monitoring System typically once a month <br /> E. Reporting <br /> 1. Report to homeowner any improper system function <br /> and date of correction. <br /> 2. Annual report to Regulatory Agency with Regulatory Agency Fee. <br /> Homeowner will be invoiced for Regulatory Agency Fee <br /> F. Alarm Response <br /> 1. Alarm response we handle from office on <br /> VeriComm Telemetry No Charge <br /> A&B Septic 2 yr AX2ORf Service Contract Page 1 <br />