My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11190175
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
11190175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:07:41 AM
Creation date
8/11/2022 4:44:26 PM
Metadata
Fields
Template:
Permits
Permit Address
355 JANICE CT
Permit City
Detroit
Permit Number
555-21-011477-PRMT
Parcel Number
105E02DA07200
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> ostp.rt up:c>.pcki4gA,d ran.pgsys ems <br /> E �y ry.. <br /> :wi <br /> AX2ON Start-Up Checklist For Oregon Service Providers <br /> Seco• <br /> ndary heat lent System Timer Settings:: <br /> RecirculatingSptitter,ValveAssembly.Verifythefollowing: ON lime: D :gj <br /> ❑Verify Proper stinger length,Stinger len OFF Nei <br /> �� ��� OVR O ON 11ma q.: <br /> ._i7.S <br /> AdvanTex System(AX2ON).Verify the.following OVR.OFF lime: q .Z <br /> E IAI pods In stalledfeVei. DiProper.wire Slip used based on information provided by <br /> UAh piping properly:covered and compacted, manufacturer <br /> C.]Corslult sealdnstalled. <br /> • <br /> ventilation system.Verify the flowing: <br /> EiVeniilation Mks)properly located and Installed. [ All electrical connectionsIn panel are secure, <br /> AdvanTex Filter Operation.Take residual head measurement ^' Panel wired per manufacturer's wiring diagram, <br /> Pad#1 Ski ivil y o ,te5 <br /> ["]rControi panel start up procedures;as detailed in the AdvanTex <br /> Pod#2: installation Guide,have been followed. <br /> Secondary Treatment Notes: [ZrApProprlate diagrams left In panel for future review. <br /> Controls Notes: <br /> • <br /> Discharge Pump Satin/Tank Verify the following: <br /> Basin Modelffank srze(s); t2'` FinaUSafefy Inspection <br /> •f'Visualty inspect basinitanks:for infiltration.. Verify the folowing: <br /> [ Cheete-that--the'basinitank-is-set ieVe. ec <br /> ' "' red-on-atlsplfce:boxpc <br /> Dlschar a BasiMank'Pumping Equipment Verify the followi ng: Q All access dser;hanhvare Is In place•Ltds:.are secured: <br /> Pumping equipment installed.properly. Q Control panel documentation Is left"atsite;panel is set <br /> U.Pump and discharge plumbing are compatible for autnimatic operation.and secured. <br /> Final Notes: <br /> (e.g.pressure rating). <br /> ti•¢r S..y. w, A r• o�, -P'vNe rises. <br /> Pump made!installs is TFaOb t 1 <br /> gilscharge plurribing proper y.Instailed through watertight` <br /> grommet,and..bait vaive Is in open position. <br /> • <br /> Floats operate properly. • <br /> rqifloatsset.roe 1 2,p <br /> HOmeOwner'S Package <br /> Splice box mounted in access risen Watertight connectors <br /> • <br /> Er <br /> used <br /> Discharge Basin/rank Pum in ❑Homeowner's Package(and manual)'has been reviewed <br /> • <br /> discharge basin/tank pumps. P 9 System.•Verify proper operation of fhe with homeowner:by:,„(check one) <br /> instafi <br /> 2;umps operate in Manual wells 1 b• ❑r cer <br /> IIf Nuteps*retain Automatic Nib lt-s !2 Q Dealerio <br /> Controis Other Hates <br /> NOT E,Refer to the control panel Instructions for detailed operational <br /> • <br /> features of the control panel WE <br /> • <br /> Ril,Number.. 1.141 WO <br /> Control Panel model installed: 4COM f w.2oNse t <br /> 5C!AT7(06t aR-i <br /> Rey]t,m lilts m MPeaneo Sltctetee'be.Pays 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.