Laserfiche WebLink
Onsite Permit 555-21-007061-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555054859284 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date Issued 7T2812,' t- `' s �� d a a a_ F*Ir c tratton date I28/22 <br /> � h`��i � �' {. ��°}. F f .a� y 3 ,� �";'k�' d �',� t� �x "" '' .� .�-ash bx t <br /> Via, a»' .� .a ' �'''' - : '`l .. raa'a t - '' l'° , f vaL .: m, 0 �'t Viii, : `'k"i <br /> n Oa rf - :. s. 'a>a'- a as 3 !P t ., z a' ` �tt4' ,''x.. a''a,:t." m ( e, w 3' ',. <br /> Wo�c dsscnpi�on MI� P`fb�,��t� �"�PII���� � � � �� � -� � e � 5�, <br /> Special Requirements <br /> Stake out required: No <br /> Groundwater type: Not Applicable Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •8"of fill and the weed fabric must be removed prior to installation. Install 24-28"below new grade(ie 32-36" <br /> below grade at time of permitting) <br /> •Properly decommission the old septic tank and submit appropriate documentation. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain <br /> access to septic tank for pumping and service. <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent,including any changes made by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services, Building Codes Division,or the municipality with jurisdiction, is required for <br /> pump wiring installation. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 7/28/21:1:05:12PM ONS_OnsitePemiitpr <br />