Laserfiche WebLink
`ryq Marion County <br /> 5155 Silverton Rd NE <br /> o Septic Authorization Approval Salem,OR 97305 <br /> 555-21-007968-AUTH 503-588-5147 <br /> o R E.G o N Building@co.marion.or.us <br /> Residential Authorization Website:co.marion.or.us <br /> • <br /> Dafe lssuetl 617/22 • •Date Ex rin 6/7123 " <br /> • <br /> a <br /> p g <br /> Work Description FIRE AUTH TO'REPL 1 BDRM SFD WITH BDRM SFD �' ti <br /> ,..ta,f <br /> Applicant: HARROLD, DON <br /> Address: 8502 ASHDOWN CT SE <br /> SALEM OR 97301-9091 <br /> Phone: 503-559-8119 <br /> Owner: ELKHORN CORP Property Address: 34885 North Fork Rd SE Bldg A,Stayton, <br /> Address: 2009 NE BRAZEE ORE 97383 <br /> PORTLAND OR 97212 <br /> Parcel:084E31 00100-Primary <br /> Authorization Notice for: Replacing One Dwelling with Another <br /> Authorization Resulted in: Repair-Minor <br /> Comments: Authorization falls under OAR 340-071-0205(4),design flow of system under COSC 555-16-008505-SEP shows 450 <br /> GPD design flow. <br /> Lot Size: 219.80 ACRES Water Supply: Well <br /> Category of Construction: Single Family Dwelling <br /> Existing Proposed <br /> a F- <br /> Use of Structure: 1 BDRM SFD(BURNED) 2 BDRM SFD <br /> Number of Bedrooms: N/A 2 <br /> System Specifications: <br /> Max Peak Design Flow: 450 gpd Proposed Gallons per Day: 225 gpd <br /> Conditions of Approval: <br /> SEE ATTACHED LETTER <br /> Note:This Notice does not guarantee satisfactory or continuous operation of the sewage system.Should the system fail,a repair <br /> permit from DEQ is required. <br /> If you disagree with this report,you have the right to apply for an authorization notice denial review.The application for review must <br /> .be submitted in writing within 45 days of the report issuance and be accompanied by the review fee in OAR 340-071-0140(3),Table <br /> 9C and any additional information DEQ needs to complete the review. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report,plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted,and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable, burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> .fe"—_- (4_ ( <br /> Aidan Bammes Onsite Wastewater Specialist 1 6/7/22 <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules.You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 6/7/22:12:08:33PM Page 1 of 1 ONS_OnsiteAuthorizationpr <br />