Laserfiche WebLink
Septic Permit 555-20-008330-PRMT Page 2 of 2 <br /> Date Certificate:issued 07I2112022 ... <br /> Work Description NEW INSTALL 5 BDRM;SFD <br /> r- <br /> Cditions afApp on rova[ <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). The system <br /> must be installed by the property owner or a licensed sewage disposal business (installer). Vehicular traffic and <br /> livestock must be restricted from the system area. All tanks must be tested for watertightness and have a water-tight <br /> riser to the ground surface. Twenty-inch minimum diameter if less than 36-in deep. Thirty-inch minimum diameter if <br /> greater than 36-in deep. Maintain access to septic tank for pumping and service.The system must be installed in the <br /> area approved during the site evaluation and in accordance with the construction plan approved by the agent, <br /> including any changes made by the agent. All work is to conform to OAR 340, Division 71 and 73. Make no changes <br /> in system location or specifications without approval by the agent. A minimum 18-gauge, green jacketed tracer wire <br /> or green color-coded metallic tape must be placed on top of the effluent sewer or pressure transport pipe from tank <br /> to drainfield. Header pipe from Distribution or Drop Box must be minimum 4-ft length, level, and bedded. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion (CSC)or rules for authorization notices, alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160, 340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. , <br /> 6. Unless otherwise required by the agent,the system installer must backfill (cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> Certfi f sfatory Coml- icate oSatic peton a M1 <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: N/A <br /> completed Inspectio _ t <br /> tts _ <br /> Inspector • Inspection Inspection Date Inspection Result <br /> Robert Goodwin 7150 Septic System 07/21/2022 Approved <br /> Robe 'o,0in - <br /> Onsite Wastewater Specialist 2 <br /> t S (()�( �LO <br /> CALL BEFORE YOU DIG...IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 7/21/22: 1:48:54PM ONS_OnsiteCSC_pr <br />