Laserfiche WebLink
• <br /> Oregon Department of Environmental Quality <br /> • <br /> • Dosing tank capacity (gallons) <br /> • Tank volume determined by:Check all that apply,•add comments below as needed <br /> ❑Permit Records.0 Measured❑Stamped on Tank❑Other <br /> • posing tank material <br /> • Dosing tank appears to be watertight and in good condition ['Yes ❑No <br /> • Dosing tank lid is intact ['Yes ❑No <br /> • l lectrical..components are sealed and watertight DYes ❑No • <br /> • • • Pump/siphon is functional DYes ❑No • <br /> • Type of pump ['Demand dose ['Time dose <br /> • Pump control mechanism is functional(floats,pressure transducer)['Yes ONO <br /> . • There is a high water alarm❑yes ❑No <br /> • The high water alarm(audible and visual)is working ['Yes ❑No [Not Applicable <br /> • Type of screen <br /> • Screen is clean and free of debris DYes ONO-Screen cleaned for this evaluation['Yes ❑No <br /> • Scum/sludge present in Dosing tank DYes ['No <br /> • Scum layer i (inches) Sludge layer. (inches) <br /> • Additional Comments: • <br /> • <br /> 5. Soil absorption system <br /> The soil absorption system is a set of trenches that receives effluent from the septic tank and <br /> filters the effluent before it enters the groundwater. <br /> • The septic system has a soil absorption system JSYes [No DUnknown <br /> • Was the soil absorption system part of the evaluation?Ares ❑No ['See note below <br /> If the soil absorption system was not evaluated;please explain below(for example unable to <br /> locate,client did not authorize this part of the evaluation): <br /> • <br /> • Absorption distribution Weal ['Serial ['Pressure DEqual via pressure <br /> • Absorption lines construction material: • <br /> XGravel and pipe ❑Chamber ❑Tile ❑Polystyrene foam and pipe ['Other <br /> • Absorption distribution unit(s):Ddropbox Dhydrosplitter Aqual distribution box <br /> ❑Intact ❑Damaged .N/A• <br /> • Absorption distribution units)are free of debris.or solids ['Yes ❑No_01N/A <br /> Page 4 6f 8 . <br />