Laserfiche WebLink
.,, Marion County <br /> 5155 Silverton Rd NE <br /> arron- . <br /> Septic Authorization Approval Salem,OR 97305 <br /> 1� <br /> 6`caunty 503-588-5147 <br /> 555-22-005329-AUTH Building@co.marion.or.us <br /> Residential Authorization Website: co.marion.or.us <br /> . d y 9 .� .+T <br /> Date lssu 6�13123 Date Exprt�ng ,4,,a ;n <br /> �'� ✓.�,✓.a�v��'� ✓ .�'d�,'��fib"7 '�.�. K a ', <br /> Work Desorption. FIRS AUTH WIFLD REPL2 BDRMrWITH NSFD' BDRM/2 BATI l <br /> . pp <br /> .`., .rA..b,: r� ✓f_ ....h,gt.Erk". .". .0.��awc.". sGt.. ...<.nva.f,/zs - ,n.,,:, .. . � .. .. � . <br /> Applicant: JACOBSEN LT&JACOBSEN, Primary Contractor: SEE PROPERTY OWNER <br /> RANDY N TRE INFORMATION <br /> Address: 151 WILDFLOWER LN Owner(Property): OWNER <br /> SILVERTON OR 97381 <br /> Phone: 503 507-5617 <br /> Owner: JACOBSEN LT&JACOBSEN, Property Address: 24023 Patton Loop SE, Lyons, OR 97358 <br /> RANDY N TRE <br /> Address: 151 WILDFLOWER LN <br /> SILVERTON OR 97381 <br /> Parcel:092E16BC00600-Primary <br /> Authorization Notice for: Replacing One Dwelling with Another <br /> Authorization Resulted in: Repair-Major <br /> Lot Size: 0.31 Water Supply: Well <br /> Category of Construction: Single Family Dwelling <br /> xrsttng Proposed' <br /> Number of Bedrooms: 2 2 <br /> System Specifications: <br /> Max Peak Design Flow: 300 gpd Proposed Gallons per Day: 150 gpd <br /> Other Special Requirement: System install without permit, however was installed level and ' <br /> at a depth of 36-40 inches in sands and gravels, approximately 75-100 ft above river.a level drop <br /> box was added and headers were leveled up, under permit#555-22-005329 and was finalled.This <br /> property was involved in the beachie Creek fire of 2020 and the home was burned.This authorization <br /> is approved for 1 single family dwelling of no greater than 2 bedrooms. <br /> Conditions of Approval: <br /> Note:This Notice does not guarantee satisfactory or continuous operation of the sewage system.Should the system fail, a repair <br /> permit from DEQ is required. <br /> If you disagree with this report,you have the right to apply for an authorization notice denial review.The application for review must <br /> be submitted in writing within 45 days of the report issuance and be accompanied by the review fee in OAR 340-071-0140(3),Table <br /> 9C and any additional information DEQ needs to complete the review. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report, plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted, and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable, burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 6/13/23:4:55:59PM Page 1 of 2 ONS_OnsiteAuthorizationpr <br />