Laserfiche WebLink
Oregon Department of Environmental Quality <br /> • • Dosing tank capacity . (gallons) <br /> • Tank volume determined by: Check all that apply,add comments below as needed <br /> • ❑Permit Records.(]Measured 0 Stamped on Tank[]Other <br /> • Dosing tank material <br /> • Dosing tank appears to be watertight and in good condition DYes ❑No <br /> • Dosing tank lid is intact :Wes ['No <br /> • Electrical components are sealed and watertight DYes ❑No <br /> • Pump/siphon is functional DYes ❑No • <br /> • Type of Pump . ❑Demand dose OTime dose <br /> • Pump control mechanism is functional(floats,pressure.transducer)DYes ❑No <br /> • There is a high water alarm DYes ❑No <br /> • The high water alarm(audible and visual)is working ['Yes ❑No [Not Applicable <br /> • Type of screen <br /> • Screen is clean and free of debris DYes ❑No-Screen cleaned for this evaluation DYes ❑No <br /> • Scum/sludge present in Dosing tank DYes ❑No <br /> • Scum layer (inches) SIudge layer . (inches) <br /> • Additional Comments: • <br /> 5. Soil absorption system <br /> The soil absorption system is a set of trenches that receives effluent from the septic tank and <br /> filters the effluent before it enters the groundwater. <br /> • The septic system has a soil absorption system i>/Yes ❑No ■ nknown <br /> • Was the soil absorption system part.of the evaluation?[(Ye. fa.k. . ❑See note below <br /> If the soil absorption system was not evaluated,please explain below(for example unable to <br /> locate,client did not authorize this part of the evaluation): <br /> • Absorption distribution ❑Equal Penal OPressure DEqual via pressure <br /> • Absorption lines construction material: • . <br /> ❑Gravel and pipe g Chamber ❑Tile ❑Polystyrene foam and pipe DOther <br /> • Absorption distribution unit(s):Jiropbox❑hydrosplitter['equal distribution box <br /> ❑Intact 0 Damaged EN/A• Absorption distribution unit(s)are free of debris or solids DYes :No N/A <br /> Page 4 of 8 <br />