Laserfiche WebLink
Septic Permit 555-23-004265-PRMT Page 2 of 3 <br /> �atE C�MtI�CiitE Ifsstt�Ed�O$103l2023 ��� SO)��k� s'E'z?v `�b�r � ra"^ .��,v`n� <br /> VUOI DESCCt�}tton G ', s11Ot5(RED E�CP AAP`:90450Stati 2739 i~ORL.Nf5TES) e i i o* <br /> a ax % � � 3v x �as ,p!~Ot1{�113i1CtS 421�P � sus„ r.w a /r` d <br /> T.. ,-, F_N„P •.., ._, , ate,.,.,e,,,, <br /> •This repair permit is for a new septic system for a residential shop. <br /> •Use a larger diameter pipe to sleeve the effluent sewer under the driveway. <br /> •Properly decommission the old septic tank and submit appropriate documentation. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> •Meet all required setbacks <br /> •Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the distribution unit. It <br /> must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from one end of the pipe to the other. In <br /> addition,there must be a minimum difference of 8 inches between the invert of the septic tank outlet and either the invert of the <br /> header to the distribution pipe of the highest lateral in a serial distribution field or the invert of the header pipe to the distribution <br /> pipes of an equal distribution absorption field. <br /> -Header pipe from Distribution or Drop Box must be minimum 4-ft length, level,and bedded. <br /> -Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Serial distribution,each trench bottom to be level and on contour.Use Drop box(es). <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.govideq/Residential/Pages/Onsite.aspx <br /> •AII work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications without approval <br /> by the agent. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1.In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply,including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> • <br /> 8/3/23:11:21:27AM ONS_OnsiteCSCpr <br />