Laserfiche WebLink
Onsite Permit 555-20-004636-PRMT Page 3 of 5 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555076005259 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued:7/21/20 • <br /> Expiration•date:7/21/21, <br /> Work description: MAJ REPAIR FOR EXIST 3•BDRM RES <br /> Conditions of approval <br /> ONSITE WASTEWATER TREATMENT SYSTEM <br /> With SEEPAGE BED AND ATT TREATMENT <br /> A SEEPAGE BED is required for this system. The bed must consist of a 15*20 ft or a 300 ft2 gravel area at a depth of <br /> 24-30 inches.Please see attached map for approved area. The bed must contain drain media at least 12 inches deep with at <br /> least 6 inches of media under the pressure distribution laterals,and sufficient media above the laterals to meet or cover the <br /> orifice shields to provide a smooth,even cover. Pressurized distribution piping must be horizontally spaced not more than <br /> 4 feet apart and not more than 2 feet away from the walls of the seepage bed. The top of the drain media must be covered <br /> with filter fabric or other non-degradable material.There must be sweeps at the end of each line to allow for cleaning and <br /> maintenance.Lateral piping orifices will need to be drilled at 1/8 of an inch,and must be spaced at 24 inches apart. <br /> SERVICE CONTRACTS: The owner of an ATT system and a seepage bed per OAR 340 must maintain a service <br /> contract with a maintenance provider certified by the manufacturer to service and maintain the onsite system. A service <br /> contract must be entered into before the permit is issued and must be maintained until the system is decommissioned. The <br /> service contract must provide for a minimum of four inspections and service visits by a maintenance provider scheduled <br /> once every six months over a two-year period to inspect,adjust,and service the ATT. The maintenance provider must <br /> submit an annual report and fee. Please review OAR 340-071-0345 for full requirements. <br /> •AN EFFLUENT LIFT PUMP WILL BE REQUIRED to install the septic system disposal field in the approved area <br /> and at the required depth. Detailed instructions for dosing tank/effluent pump installations are available in our office. The <br /> electrical wiring to the pump and alarm must be installed in accordance with the appropriate Electrical Code. The <br /> electrical work must be done under a Marion County Electrical Permit and must be inspected and approved by a Marion <br /> County Electrical Inspector. The work must be left uncovered and accessible for inspection. The electrical inspection <br /> includes the connections to the pump and alarm in the dosing tank,the wiring in the trench and the connections in the <br /> structure. <br /> Please provide an installation plot plan,an operation and maintenance agreement and a materials list so that an installation <br /> repair permit can be issued. <br /> • <br /> 7/21/20:9:53:43AM Page 3 of 5 ONS_OnsitePermit_pr <br />