Laserfiche WebLink
Septic Permit 555-20-004636-PRMT Page 3 of 4 <br /> tii{{�y��,� , _ j a 7 ,. ,�s ,�(�:� r r.«.x � w bf ,� <br /> ✓6 ..;l�sue40"0-03120Z0 f.,,� 3 LS sS KR"�q ,,Z-�4 '1 : f4 09 � � y. o °%" �, .' <br /> � ¢�,'�5 f ^C k �€� 'r '' ln/ .� ¢��O .fir✓✓a 1,,,�'s r�'& .��, t��� �.�� ��a <br /> WOI CC l scFl {�ClR� R�1A1R } t3 a¢ 3� � <br /> sF � a �' � �s� ��g" �a`srr '� ',*r `�t €'sy��`�.a � <br /> ad � � kehoi ` <br /> .,,:.���,»Y...,s.,..✓.°.�,'6t�,ru��„',¢�&1, a,».��� „�.@: r« &„,yap- <br /> -ATT treatment standard 2 required. <br /> -This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be installed by a <br /> person certified by the system manufacturer in accordance with OAR 340-071-0600 and 0650. See Alternative <br /> Treatment Technology rules at OAR 340-071-0345. <br /> •In addition to the As-Built and Materials List, a Start-Up checklist from the ATT maintenance provider is required to <br /> Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the manufacturer <br /> to inspect, adjust and maintain the onsite system. The maintenance provider must submit an annual report and <br /> annual evaluation fee. <br /> -A squirt test inspection of the pressurized piping system is required. <br /> -The system must be installed by the property owner or a licensed sewage disposal business (installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> -All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access <br /> to septic tank for pumping and service. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building, electrical, or other codes.An electrical permit and inspection from the Department of Consumer <br /> and Business Services, Building Codes Division, or the municipality with jurisdiction, is required for pump wiring <br /> installation. <br /> -Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with acceptable <br /> threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10%variation. <br /> -Filter fabric required over drain media (rapidly permeable soils). <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 9/6/23:8:51:40AM ONS_OnsiteCSC pr <br />