My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11853059
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
20-XXXXXX
>
11853059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2023 2:03:52 PM
Creation date
9/18/2023 12:13:06 PM
Metadata
Fields
Template:
Permits
Permit Address
9565 ELKHORN WOODS CIR SE
Permit City
Lyons
Permit Number
555-20-004636-PRMT
Parcel Number
093E02DD00500
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Start-Up Ctwcklist/ duanTex°<Sysfems;' k <br /> AX2ON Start-Up Checklist For OregonService i Providers <br /> �r <br /> �D�I derS <br /> Secondary Weatment Tyner Settings: <br /> Recln;ufadng Splitter Valve Assembly.Verify the following: ON Time: .9 <br /> Verify proper stinger length.Stinger length: OVR OOFF Time: <br /> — <br /> AdvanTex System(AX20N).Verify the foaming: F OVR OFF Time: <br /> 1:416-pods installed lever. <br /> arroper <br /> EglqPIPind ProPesly=w and compacted. wire size used based on thfonrhatio,h provided <br /> manufachuer. <br /> Venttiittet on System.Verity the following: [�.(r ,(t sealtesta d <br /> B Verboten Intake(s)properly iccated and Installed. Qom)electricalAdvanTex Filter Operation.Tatra residuar connections in panel are secure. <br /> head measurement _Wane(wired per manufacturer's wiring diagram. <br /> Pod 41: 1>''I <br /> Pod 112 Instance ate Guide, been followstart-up proceduresed., <br /> as detailed In the Tex <br /> Secondary Treatment Notes: / <br /> L'g'Approprlate diagrams left in panel for future review. <br /> Controls Notes: <br /> iF <br /> wiIi / ve '}. <br /> .L4_.if>ahea <br /> Discharge Pump BasiNTank.Verify the following: <br /> Basin Model/rank stze(s):.�T_ t rnaUSafety Inspection <br /> Rfasuartr inspect bastvtanks for Infiltration. Verify the folowing: <br /> at he-bastMenkfsse A . <br /> Discharge BasiMank Pumping Equipment Verify the following: <br /> �-y �ss riser hardware Is In place,tkis are secured. <br /> [2/Pumping equipment Instated properly. <br /> u 13ump end discharge plum for documentation is left at site;panel is set <br /> (e.g.pressure rat9npaiiMe operation and seared. <br /> n9) 2 Firm otes: I_ a�L/ 7* - �� 4--,..i <br /> P model Installed_ F��_, I Q�4 Manly <br /> ! <br /> • <br /> I ge plumblg Properly Installed through watertight i <br /> grommet,and ball valve is in open position. <br /> 2oats operate properly, <br /> le .,its set properly. it .r aii a3„ <br /> La .teebox mounted Inaccess riser.Watertight connectors Homeowner's Package <br /> used <br /> Discharge BasinRank Pumping System.VEl <br /> Now Package( has been reviewed <br /> discharge baslry ank pumps. Verify proper operation of the with homeowner by. (check one) <br /> rrnnPs InrvManual �v Elr <br /> C1 <br /> CiKtrnpsoperate In Automatic yes D serer Provider <br /> Vo\�S �p ❑Dearer <br /> Controls Other Notes' <br /> NOTE:Refer b the control panel ksSvc>ions!or wed operational <br /> features of the control panel itself. <br /> Control Panel model Instated <br /> hint It O HAS <br /> Rage 2 et2 a aces eaem lysfnass•he <br />
The URL can be used to link to this page
Your browser does not support the video tag.