Laserfiche WebLink
Onsite Permit 555-23-004156-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555042706437 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> bate issiued 6112/23 �y� ,N a3 �� RExpiration date 6/'11t24' <br /> Work descnption FIRE ;MAJ REP FOR 3 DORM SFD TO REPL 3 BDRM SFD 4 € • <br /> Min depth: 40 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: must remove logs and may need to till area to break up compaction <br /> Conditions of approval <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground • <br /> surface.Twenty-inch minimum diameter if less than 36-in deep.Thirty-inch minimum <br /> diameter if greater than 36-in deep. Maintain access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location <br /> or specifications without approval by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring <br /> must comply with applicable building,electrical, or other codes.An electrical permit and <br /> inspection from the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump wiring installation. <br /> -Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must <br /> be placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Serial distribution, each trench bottom to be level and on contour. Use Drop box(es). <br /> 6/12/23:8:38:37AM ONS_OnsitePermitpr <br />