Laserfiche WebLink
Septic Permit 555-22-000929-PRMT-01 Page 2 of 3 <br /> t*arhi'Vjiet�'iMia'mo '& ° `�*� tx } ` -+ ge ,�.'. <br /> i�T Try „ k, < . fi£"'�}+ "_ <br /> tfyb�t3ePon. � brl1.3 Ch*tl( �U1ilVINSFt7 3 Bt3R } �FGfOI PTIUa <br /> #2;.q.,,, zkfik <br /> �A <br /> ,w !4- �, 4 rR,x,.. � ., w ., <br /> -Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with <br /> acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10%variation. <br /> filter fabric required over drain media(rapidly permeable soils). <br /> -The owner of a pressurized distribution system must maintain a contract with a certified maintenance <br /> provider to inspect, adjust and maintain the onsite system.The maintenance provider must submit an <br /> annual report and annual evaluation fee. <br /> •A site inspection of both the absorption area and the borrow material is required prior to cap <br /> construction. <br /> -An inspection of the constructed cap is required. <br /> •A squirt test inspection of the pressurized piping system is required. <br /> •A final inspection is required after landscaping or other erosion control measures are established. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> •Meet all required setbacks <br /> The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent,including any changes made by the agent. <br /> •All work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications without approval <br /> by the agent. <br /> for product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical,or other codes.An electrical permit and inspection from the Department of Consumer and Business Services, Building <br /> Codes Division,or the municipality with jurisdiction,is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340,Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 8/30/23:10:51:46AM ONS_OnsiteCSC_pr <br />