My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11853073
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
11853073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2023 1:23:33 PM
Creation date
9/18/2023 12:13:41 PM
Metadata
Fields
Template:
Permits
Permit Address
33782 RAILROAD AVE SE
Permit City
Gates
Permit Number
555-22-000929-PRMT-01
Parcel Number
093E25DD01400
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-22-000929-PRMT-01 Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555087071266 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued 7f1"1122 Expiration date 7f11/23 <br /> Work description FIREAUTH.MA4 REP REPL 3 BDRM_RES WITH NSFD 3 BDRM*SAME FOOTPRINT. <br /> Special Requirements <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: Operation and Maintenance contract required to final installation and electrical inspection must be finalled to <br /> final septic system installation <br /> Conditions of approval <br /> •Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral <br /> piping with acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less <br /> than 10%variation. <br /> •Filter fabric required over drain media (rapidly permeable soils). <br /> -The owner of a pressurized distribution system must maintain a contract with a certified <br /> maintenance provider to inspect, adjust and maintain the onsite system.The maintenance <br /> provider must submit an annual report and annual evaluation fee. <br /> •A site inspection of both the absorption area and the borrow material is required prior to <br /> cap construction. <br /> •An inspection of the constructed cap is required. <br /> •A squirt test inspection of the pressurized piping system is required. <br /> •A final inspection is required after landscaping or other erosion control measures are <br /> established. <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building, electrical, or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services, Building Codes Division,or the municipality with jurisdiction, is required for <br /> pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge, green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 7/11/22:9:41:59AM ONS_OnsitePermit_pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.