My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11853099
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
11853099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 1:58:20 PM
Creation date
9/18/2023 12:14:37 PM
Metadata
Fields
Template:
Permits
Permit Address
2269 STEIWER RD SE
Permit City
Jefferson
Permit Number
555-22-004564-PRMT
Parcel Number
093W14D 00300
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-22-004564-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555042861037 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued 6/24/22 Expiration date 6124/23 <br /> Work description OEWilNSTALL FOR;4 BDRM RES <br /> o <br /> < a <br /> ..�V,�, .. a.✓n_ _ _ ,... .... .._ . <br /> Min depth: 24 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> • <br /> Stake out required: Yes <br /> Other special rqmt: System will be equipped with pump however pump is not required for this installation if gravity flow can be <br /> achieved. <br /> stakeout ok <br /> Conditions of approval <br /> •An electrical permit and inspection from the Department of Consumer and Business Services, <br /> Building Codes Division,or the municipality with jurisdiction,is required for pump wiring installation. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent,including any changes made by the agent. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the <br /> distribution unit. It must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from <br /> one end of the pipe to the other. In addition,there must be a minimum difference of 8 inches between the invert of <br /> the septic tank outlet and either the invert of the header to the distribution pipe of the highest lateral in a serial <br /> distribution field or the invert of the header pipe to the distribution pipes of an equal distribution absorption field. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level,and bedded. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Serial distribution,each trench bottom to be level and on contour.Use Drop box(es). <br /> •All work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes. <br /> 6/24/22:11:12:06AM ONS_OnsitePermit pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.