Laserfiche WebLink
Septic Permit 555-21-005331-PRMT-01 Page 2 of 3 <br /> aw5 s l -t X <br /> Date Cent cafe Cssued 08/3lJ2023 ! ^x ss <br /> Work Descript[an ,� RE MAJ REf? F3Z�RM SFD T()REP f CE 3 8i?RAA � ' <br /> } � ��d iC! 6�: abuN��''4 d „g .k�4 ti ua�' ✓x$ ,� �a��� � L yam, <br /> Canciifrons a approval <br /> Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with acceptable <br /> threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10%variation.Filter fabric required over <br /> drain media (rapidly permeable soils).The owner of a pressurized distribution system must maintain a contract with <br /> a certified maintenance provider to inspect, adjust and maintain the onsite system.The maintenance provider must <br /> submit an annual report and annual evaluation fee.Dry soil installation only(June 1 —October 1 unless otherwise <br /> authorized by the agent).The system must be installed by the property owner or a licensed sewage disposal <br /> business (installer). Vehicular traffic and livestock must be restricted from the system area. All tanks must be tested <br /> for watertightness and have a water-tight riser to the ground surface. Twenty- inch minimum diameter if less than <br /> 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. Meet all required setbacks All work is to conform to OAR 340, Division 71 and 73. Make no changes in <br /> system location or specifications without approval by the agent. For product approval information and manufacturer <br /> installation requirements see DEQ website at: http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx The pump <br /> and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical, or other codes. An electrical permit and inspection from the Department of Consumer and Business <br /> Services, Building Codes Division, or the municipality with jurisdiction, is required for pump wiring installation. Install <br /> the pump and system components in accordance with the approved pump curve and specifications.A minimum <br /> 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include,but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply,including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 8/31/23:11:49:22AM ONS_OnsiteCSCpr <br />