Onsite Permit 555-21-005331-PRMT-01 Page 3 of 3
<br /> Schedule or track inspections at www.buildingpermits.oregon.gov
<br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555066167571
<br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store
<br /> IIote issuS;_,.e:.=s or4-:a.2` 2a^'!s e w4 w�F - w v",Fr-.... fz wr F x f'*t ,
<br /> ate—
<br /> if11ailed`#scattitr t-4 1,1vwx.-Ea 3:- C RMIBFI1 agl. AP `3"1BDL - -�-- M ki ss m o uz r=�
<br /> -x' .:w' ,�'t-�� �. , ,�'�5.'�{` .�,�' t.'��,�i. w � ��.�.� ��.,d-"s�- -v, .u �r 3F- +2 .v,
<br /> err Ott : F,<-- ,. .... ' �?
<br /> ,�c�.�—.,,.-s-..:;�".�:3x mg�; --�a..�::,:�:>,_ �--„„m.-c. �,�u ,.a� �-. u� � � [ ��, n ,�: „�•„r-a-.. �,,,.w;.�_ -,-�:_ �
<br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system
<br /> specified above.
<br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at:
<br /> http://www.deq.state.or.uslwq/onsite/onsite.htm
<br /> General Conditions And Requirements For All Permits:
<br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is
<br /> noted on this permit.Renewal of a permit may be granted if an application for permit renewal is received
<br /> before the permit expiration date.Reinstatement of a permit may be granted if an application for permit
<br /> reinstatement Is received within one year after the permit expiration date.Transfer of a permit from the
<br /> permittee to another person may be granted if an application for permit transfer is received before the permit
<br /> , expiration date and no other changes to the permit are necessary.
<br /> Installation Requirements:The drainfield must be installed in undisturbed native soil.No alterations of the
<br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas
<br /> for both the initial and replacement systems are allowed,unless otherwise authorized by the Agent.Do not
<br /> install system when soil moisture,high groundwater,adverse weather,or other conditions that could affect the
<br /> quality of installation or reliability of the system are present.If such conditions are present and there is a need
<br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in
<br /> 340-071-0160(9).
<br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when
<br /> the construction,alteration,or repair of a system for which a permit was issued is completed(except for the
<br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the
<br /> completed construction after the official notice date,unless the permitting agent elects to waive the inspection
<br /> and authorizes the system to be backfilled earlier.Receipt and acceptance of a completed Final Inspection
<br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final
<br /> inspection.Faxed copies are acceptable for inspection request purposes only.Originals must be received
<br /> before a Certificate of Satisfactory Completion can be issued.
<br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting
<br /> agent has approved the construction installation,*or the inspection has been waived*or the Certificate of
<br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been
<br /> conducted within 7 days of notification of completed installation).
<br /> Unless otherwise required,it is the system installer's responsibility to backfill the system within 10 days after
<br /> inspection and issuance of the CSC.Backfill must be carefully placed to prevent damage to the system.The
<br /> backfill must be free of large stones,frozen clumps of earth,masonry,stumps,waste construction materials,
<br /> or other materials that could damage the system.Be sure that the untreated building paper,filter fabric,or
<br /> other material approved by the agent is completely covering all drain media where required prior to backfill.
<br /> The system can be connected to and placed into service once it has been properly backfilled and the CSC has
<br /> been issued.
<br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated
<br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt
<br /> or concrete,filling,cutting,or other soil modifications.
<br /> Kimberlee Aldrich Onsite Wastewater Specialist 2 /31/22
<br /> 8/31/22:8:37:25AM ONS_OnsitePermit pr
<br />
|