Laserfiche WebLink
Septic Site Evaluation 555-22-010554-EVAL Page 2 of 2 <br /> Date issued,i 08/31 801 4 � zip f 4 ' O � 4 00irl <br /> �� �'y "`� ,�, a `h.t� � €` <br /> a a 1 d^ <br /> � + <br /> AppGca ion status Sl V2ftiatiOnt4plitoVeft.zr a f i a 4 � a <br /> Work description SEA FUTURE FIRE STATION , & ' <br /> ,•x '"n a °F fAtsy ai d,x F 5 �`-- � B f s:fir 1: <br /> Trench linear feet: 160 linear ft. 160 linear ft. <br /> Max depth: 15 in. 15 in. <br /> Min depth: 12 in. 12 in. <br /> Capping fills-min depth of fill material: 10 in. 10 in. <br /> $pecla R0qut ents Initial System Replacement Area <br /> Stakeout required: Yes Yes <br /> Groundwater type: Temporary Temporary <br /> Groundwater depth: 21 in. 21 in. <br /> Drainfield type: Capping Fill Capping Fill <br /> Drainfield sizing: 50 linear ft/150 gal. 50 linear ft/150 gal. <br /> Pump to drainfield required: Yes No <br /> Other special requirement: ATT+EQUAL HYDROSPLITTER AND ATT+EQUAL HYDROSPLITTER AND <br /> CAPPING FILL CAPPING FILL <br /> Gravelless absorption also ok 10"min Gravelless absorption also ok 10"min depth <br /> depth 12"max depth. 12"max depth. <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system.Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site,or placement of wells or utilities,etc.,may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report,plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted,and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable,burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> • A lc- cel-c <br /> Aidan Bammes Onsite Wastewater Specialist 2 8/31/23 <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules.You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center Is 1-800-332-2344.) <br /> 8/31/23:11:05:56AM Page 2 of 2 ONS_OnsiteEvaluation_pr <br />