<br /> •This repair permit is for replacement of the existing septic system following the Lionshead Fire of 2020 which burned this
<br /> property.
<br /> •Properly decommission the old septic tank and submit appropriate documentation.
<br /> Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with acceptable threaded
<br /> plugs or caps.Minimum head of 5-ft at remotest orifice,less than 10%variation.
<br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent).
<br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer).
<br /> •Vehicular traffic and livestock must be restricted from the system area.
<br /> •All roof drains must be directed away from the system
<br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if
<br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and
<br /> service.
<br /> •Meet all required setbacks
<br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan
<br /> approved by the agent,including any changes made by the agent.
<br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building,
<br /> electrical,or other codes.An electrical permit and inspection from the Department of Consumer and Business Services, Building
<br /> Codes Division,or the municipality with jurisdiction,is required for pump wiring installation.
<br /> •Install the pump and system components in accordance with the approved pump curve and specifications.
<br /> •An anti-buoyancy device is required for the septic tank(s)and must be installed as per the manufacturer installation guidelines.
<br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer
<br /> or pressure transport pipe from tank to drainfield.
<br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in
<br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above.
<br /> 1.In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of
<br /> satisfactory completion of an onsite wastewater treatment system at the location identified above.
<br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will
<br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system.
<br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect
<br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock,
<br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities.
<br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance
<br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or
<br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment
<br /> of an additional fee.
<br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard
<br /> or pollute public waters.
<br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the