Laserfiche WebLink
Septic Permit 555-22-007282-PRMT Page 2 of 3 <br /> Date Ce,0cate Issued: 10/31/2023 <br /> t R <br /> Work©esenption NEW INSTALL 3 6ORM SFD <br /> 3 <br /> `'a� s r K x,tRF ' € �'ti 6g 1, ,Conditions f Approval ,w .� lc.. y�s <br /> •This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be <br /> installed by a person certified by the system manufacturer in accordance with OAR 340-071-0600 and 0650. <br /> See Alternative Treatment Technology rules at OAR 340-071-0345. <br /> •ATT treatment standard 1 required. <br /> -In addition to the As-Built and Materials List,a Start-Up checklist from the ATT maintenance provider is <br /> required to Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the <br /> manufacturer to inspect,adjust and maintain the onsite system.The maintenance provider must submit an <br /> annual report and annual evaluation fee. <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business (installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •AII tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty- <br /> inch minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. <br /> Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •AII work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply <br /> with applicable building,electrical, or other codes.An electrical permit and inspection from the Department <br /> of Consumer and Business Services, Building Codes Division,or the municipality with jurisdiction, is <br /> required for pump wiring installation. <br /> -Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on <br /> top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> -Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> -Serial distribution,each trench bottom to be level and on contour. Use Drop box(es). <br /> 10/31/23:8:26:24AM ONS_OnsiteCSCpr <br />