My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11979823
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
11979823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 11:04:27 AM
Creation date
12/14/2023 4:13:36 PM
Metadata
Fields
Template:
Permits
Permit Address
8955 SUNNYVIEW RD NE
Permit City
Salem
Permit Number
555-22-002106-PRMT
Parcel Number
072W13CA00100
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-22-002106-PRMT Page 2 of 2 <br /> Date P:t 4-#0:4 ISS @fi I014 <br /> W cn orkDespti;on R)DN-(50{}GA i ANK FOR NEW`RESTROOMS NOtADDtF,O AL EM sPLOYEES �.p ittrt' } ,% <br /> x7&fie <br /> CQEtd1t101'15 O �� 6 ' e <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical,or other codes.An electrical permit and inspection from the Department of Consumer and Business Services, Building <br /> Codes Division,or the municipality with jurisdiction,is required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •An anti-buoyancy device is required for the septic tank(s)and must be installed as per the manufacturer installation guidelines. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> •Meet all required setbacks <br /> All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> System Inspection: No Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: Yes <br /> Comments: Pump and Alarm inspection Waived <br /> • ^ •Co ay _mpleted llnspecttnris .o�... <br /> Inspector Inspection Inspection Date Inspection Result <br /> Aidan Bammes 7999 Final Septic 11/22/2023 Approved <br /> Kimberlee Aldrich 7310 Pump/Alarm System 11/22/2023 Approved <br /> Robert Goodwin 7020 Pre-cover 05/23/2022 Approved <br /> eff— W10 14VC-- <br /> I er ee A dric � Onsite Wastewater‘De6c4V2 <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 11/28/23: 1:00:50PM ONS_OnsiteCSC_pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.