My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11987561
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
11987561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2023 1:11:10 PM
Creation date
12/21/2023 8:43:43 AM
Metadata
Fields
Template:
Permits
Permit Address
251 KENS WAY S
Permit City
Salem
Permit Number
555-22-001573-PRMT
Parcel Number
093W04D 01801
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Start-Up ChecklisUAduanTexo Systems <br /> AX2ON Start-Up Checklist For Oregon Service Providers <br /> Secondary Treatment System Tuner Settings: <br /> Recirculating Splitter Valve Assembly.Verify the following: : D t.D <br /> ❑Verify Per stinger length.Stinger length: iU ON T/A OFF 6. 0 <br /> AdvanTex OVR ON Time: <br /> t.O <br /> System(AX2ON).Verify the following: OVR OFF lime: - ."5 <br /> gAti Pods lnstailed level. DiProper wire size used based on Information provided <br /> by <br /> '�piping covered manufacturer.property and compacted, <br /> Venblatioa System.Verify the following: Conduit seal installed. <br /> RiVentllatton Intakes)propertymated and installed. OM electrical connections In panel are secure. <br /> Advanlex FUter Operation.Take residual head measurement: Panel caked per manufacturer's wiring diagram. <br /> Pcd it: Sp ivti h oz7-tz:S Q'Contro{Pod#2: <br /> panel start-up procedures,as detailed In the Advan7ex <br /> installation Guide,have been followed. <br /> Secondary Treatment Notes: Q'Appropriate diagrams left In panel for future review. <br /> Controls Notes: <br /> Discharge Pump Basin/Tank.Verify the following: <br /> Basin MSodeVTank size(s): <br /> =T FinaUSafety Inspection <br /> �j([1 Visually Inspect basin/tanks�f�o�r infiltration. Verify the following: <br /> l_l"'i what-the fro al k U-sC _15t ♦ e�J[j+�nn Am p_t crXa <br /> _,_aischarge Basin/Tank Pumping Equipment Verify the following: RI All access riser hardware is in place.Lids are secured. <br /> Q'Ptunping equipment installed property, El Central panel documentation is left at site; <br /> �Ptanp and discharge plumbingare for automatic operation and secured. panel sat <br /> (e.g.pressure <br /> compatible <br /> • <br /> roll <br /> S ng) Final Notes: �S�l/Y1 (C'�-1— O Vl '�b Y u-S>° <br /> Pump model Installed: ?'34:DpSk <br /> [✓�Dlscharge plumbing property Installed through watertight <br /> grommet,and ball valve is in open position. <br /> Floats oper <br /> ate e . <br /> ProPefh' <br /> Ef Floats sat properly. t " 25.11 2 r <br /> 2/Splice box mounted in access riser.Watertight connectors Homeowner's Package <br /> 2/Splice <br /> used. ❑Homeowner's Package <br /> Discharge Basin/Tank Pumping System,Ve (andmanual)has been reviewed <br /> di e basin/tankrnY proper operation of Gne with homeowner by...(check one) <br /> pumps. <br /> n Installer <br /> Pumps operate in Manual . O <br /> Er-� Service Provider <br /> Pumps operate in Automatic y o tk.S 12—2_. l Dealer <br /> Controls Other Notes: <br /> NOTE:Refer to the control panel Instructions for detailed operational <br /> features of the control panel itself. <br /> RTU Number: t C <br /> Control Panel model installed: It GOrrl c X 2.0 r, <br /> SCLAIX-0I1-08-1 <br /> limit,o tU85 zoos or.aca 'lAc. <br /> Pail 2d2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.