My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11988965
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
11988965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 11:54:49 AM
Creation date
12/21/2023 4:43:41 PM
Metadata
Fields
Template:
Permits
Permit Address
4215 CLOVERDALE DR SE
Permit City
Turner
Permit Number
555-22-010806-AUTH
Parcel Number
092W06A 00800
Permit Type
Authorization
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Marion County Onsite Disposal System Fee Schedule <br /> Effective July 1, 2022 <br /> Marion DEQ Total Fee <br /> New Site Evaluations w/DEQ <br /> County Fee Surcharge <br /> Surcharge , <br /> Single Family Dwelling -First Lot $725 $100 $825 <br /> -each add'l lot evaluated during initial visit $670 $100 $775 <br /> Commercial Facility System—First 1,000 Gallons $780 $100 $880 <br /> r'..' -Each Additional 500 Gallons $150 - $150 <br /> Total Fee <br /> Construction Installation Permits Fee DEQ w/DEQ <br /> Surcharge Surcharge <br /> Standard System,Redundant System,Saprolite, Seepage Pit,Steep $1010 $100 $1110 <br /> Slope <br /> Alternate Treatment Technologies,Capping Fill,Pressure Distribution, $1320 $100 $1420 <br /> Tile Dewatering <br /> Sand Filter,Recirculation Gravel Filters $1500 $100 $1600 <br /> Gray Water Disposal Sump $360 $100 $460 <br /> Holding Tank $705 $100 $805 <br /> Major Repair . $600 $100 $700 <br /> Minor Repair $305 $100 $405 <br /> Major Alteration Permit $745 $100 $845 - <br /> Minor Alteration Permit $415 $100 $515 <br /> Permit w/sewage flow> 1000 gallons per day in addition to above,per $90 - $90 <br /> 500 gallons per day <br /> Pump System-in addition to permit fee $60 - $60 <br /> Permit Renewal/Transfer-Field Visit $420 $100 $520 <br /> Permit Renewal/Transfer-No Field Visit $30 $100 $130 <br /> Total Fee <br /> Commercial PIan Review Fee: .. DEQ . w/DEQ <br /> Surcharge Surcharge <br /> Gallon/day=601 - 1000 Gallons $310 - $310 <br /> Each 500 Gallons per day above 1000 $60 - $60 <br /> Total Fee <br /> Other Onsite Activities. Fee DEQ w/DEQ <br /> Surcharge Surcharge <br /> Authorization Notice with Field Visit $605 $100 $705 <br /> Authorization Notice without Field Visit $205 $100 $305 <br /> Pumper Truck Inspection-First Truck $170 - $170 <br /> Pumper Truck Inspection-Additional Truck $90 - $90 <br /> Existing System Report $565 $100 $665 <br /> Mobile Hardship Renewal Inspection $330 . $100 $430 <br /> Annual Report Evaluation Fee Holding Tanks/Alternate Systems $70 - $70 <br /> Alternate System Inspection Fee $430 - $430 <br /> Hourly Inspection Rate $70 - $70 <br /> Reinspection Fee $70 - $70 <br /> Compliance Recovery Fee(For work done without permits)when Varies <br /> authorized by OAR 340-071-0140 is equal to the application fee. <br /> Record Review $60 - $60 <br /> Page 2 of 2 <br /> F:\FORMS\SEPTIC\S-01 ONSITE APPL JULY 2022.DOCX Rev 1/15,3/18,6/22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.