Laserfiche WebLink
Onsite Permit 555-22-010189-PRMT-01 Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555042853918 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued 2/8/23 F'. Expiration date:'218124 <br /> Work description MAJ REP TANK FOREPL 3 BDRM RES WITH NSFD 2 BDRM/OFFICE <br /> q <br /> Stake out required: No <br /> Groundwater type: Temporary Groundwater depth: 14 in. <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •This permit is a reasonable repair allowing the pressure transport line to be less than 5'from the foundation. In <br /> conjunction with Marion County Building Inspection,the pressure line must be installed at a depth so that it will <br /> not influence the foundation or be damaged by the force of the foundation. It must be sleeved with a larger ID SCH <br /> 80 PVC to prevent damage when backfilling/grading around the foundation. <br /> •This permit is for the installation of an Alternative Treatment Technology(AU)system and is to be installed by <br /> a person certified by the system manufacturer in accordance with OAR 340-071-0600 and 0650.See Alternative <br /> Treatment Technology rules at OAR 340-071-0345. <br /> •ATT treatment standard 1 required. <br /> •In addition to the As-Built and Materials List,a Start-Up checklist from the ATT maintenance provider is <br /> required to Final this permit. <br /> •The owner of an AU system must maintain a contract with a maintenance provider certified by the <br /> manufacturer to inspect,adjust and maintain the onsite system.The maintenance provider must submit an,annual <br /> report and annual evaluation fee. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications <br /> without approval by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services,Building Codes Division,or the municipality with jurisdiction, is required for <br /> pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •An anti-buoyancy device is required for the septic tank(s)and must be installed as per the manufacturer <br /> installation guidelines. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> Effluent filter required at tank outlet. <br /> •Equal distribution,all trench bottoms must be at the same elevation.Use Distribution box(es). <br /> 2/8/23:3:40:45PM ONS_OnsitePermitpr <br />