Laserfiche WebLink
1110 Problem Work requested' <br /> Please replace contactor on Well pump#1 and record <br /> Voltage and amps check with operations to see if we can <br /> install alarm on system failure. <br /> Master Permit Electrical Added task: Breaker occasionally tripping on the 7.5 hp Public Works Bldg 01 <br /> booster pump and the 2 hp keeps running but doesn't <br /> seem to build any pressure. <br /> Please look at moving the air compressor from the <br /> Courthouse to PW Building#4 Sign Shop. Let me know if <br /> Master Permit Electrical Public Works Bldg 04 <br /> there is enough power and what it would cost to do. <br /> Per Jason Sykes (x3196), they need a plug in the Building <br /> 2 break room changed.They found the desk was hard <br /> Master Permit Electrical Public Works Bldg 02 <br /> wired instead of just plugged in. Please contact Jason with <br /> any questions. <br /> The one HID light takes a long time to come on and needs <br /> Master Permit Electrical replaced. Replace with an extra 150W LED fixture that was Public Works Bldg 04 <br /> removed from JDC Gym. <br /> #1 -Wire in new air compressor. <br /> #2-Change the 110v outlet at the right end of the work <br /> bench to a quad outlet. <br /> #3-Add a quad outlet to the wall in the break room near <br /> Master Permit Electrical the coffee maker. Public Works Bldg 12 <br /> #4-Change the 110v outlet on the wall behind the <br /> refrigerator to a quad outlet. <br /> Quote has been approved per Dennis. <br /> Per Jolynn (x7925), she'd like to add three light fixtures to <br /> Master Permit Electrical Public Works Bldg 09 <br /> Building 9. <br /> Per Jolynn Skyberg (7925),the hot box pothole patching <br /> truck(PW1001) has started going out since the weather <br /> has improved. There is a Plug and extension cord that <br /> Master Permit Electrical Public Works Bldg 06 <br /> goes form the wall to the truck that supplies power to keep <br /> the box warm. It appears to have stopped working. <br /> 411 <br />