MOT-0347 BJL 3/17/20 00312MJN1 THE MOTOR MEGS LOW AT LESS THAN 15 MEGAOHMS. <br /> WAVER IN THE J-BOX AND THE CONNECTION BLOCK IS <br /> CRACKED.---Wired in new motor,replaced flex and pulled in new <br /> wire from push button J-Box. <br /> 027 GRAVITY THICKENER FACILITY <br /> ITEM BY C-DATE W/O# • <br /> 027LIT132A CLC 10/13/20 90725JCF1 METER OUTPUT IS FLAT-LINED AND SCREEN SHOWS <br /> "FAILSAFE".---removed all three dob meters from service <br /> ELT027A EC 7/17/20 00708EC01 EMERGENCY LIGHT FAILED 30 MINUTE TEST, REPLACE <br /> BATTERY---Replaced battery,tested and cleaned fixture. <br /> 034 BIOSOLIDS STORAGE LAGOON#2 <br /> ITEM BY C-DATE W/O# <br /> 034 BJL 11/10/20 01104DJB1 REMOVE MOTION SENSOR STAND AT BIGTOP AND HAVE <br /> MECHANICS EXTEND IT TO 42" REMOUNT SENSOR SO <br /> THAT IT IS ABOVE THE PLYWOOD AND ANGLED TOWARDS <br /> THE NORTHEAST.---unwired stand and wired back in once the <br /> mechanics extended stand <br /> BLDG034DWS01 MJN 10/23/20 00825GCP1 MOVE OR MODIFY THE LIGHTING CONDUIT AS NEEDED SO <br /> THAT ANOTHER COURSE OF BLOCKS CAN BEEN ADDED <br /> TO THE OUTSIDE RETAINING WALLS OF THE STORAGE <br /> SHELTER. <br /> Work completed by NSE <br /> 038 TRICKLING FILTER FACILITY <br /> ITEM BY C-DATE W/O# <br /> 038 BJL 6/8/20 00517JMG1 175 WATT WALLPACK FIXTURE IS NOT WORKING. <br /> INSTALLING A NEW LAMP DID NOT FIX IT.NEED TO • <br /> INSTALL A NEW BALLAST.---Replaced ballast and capacitor in <br /> south wallpack at top of tower. <br /> LGT-0062 BJL 11/12/20 01020BGW1 STREET LIGHT 62 BY NORTH SECONDARY CLARIFIER IS <br /> NOT WORKING.---Replaced blown fuses. <br /> SMP038NPEOI PJS 3/3/20 00303DER3 THE PINCH HOSE IS LEAKING AT THE CONNECTION TO <br /> THE BEVERAGE HOSE. Replaced hose and burned-out lightbulb <br /> above light switch by door. <br /> SMP038NPEO1 PJS 6/18/20 00618BGW I PINCH VALVE BELOW SIGHT GLASS NOT RELEASING <br /> CORRECTLY. <br /> Replace Bimba pinch valve.Tested OK. Reseated fallen enclosure <br /> LED lighbulb above lightswitch and changed out the other one(old) <br /> to the same LED style/intensity. <br /> XFMR038A MJN 1/3/20 91001BDW2 INVESTIGATE AND REPAIR SUSPECTED TRANSFORMER <br /> CASE LEAK AS EVIDENCED BY N2 PAD NOT MAINTAINING, <br /> ELECTRICAL TEST RESULTS AND MOISTURE IN FR3 <br /> OIL...Repairs made by NASS(North American Substation Services) <br /> oil has been filtered and retested.All disolved gas levels are normal <br /> and transformer is holding between-.5 vacuum to.5 PSI <br /> 043 RAS PS AND SOUTH SEC FACILITY <br /> ITEM BY C-DATE W/O# <br /> 043 MJN 6/8/20 71001 BDW 1 PROVIDE SEQUENCE CONTROL IN THE DCS FOR THE RAS <br /> PUMPS. WIRE AS NECESSARY TO IMPLEMENT.ADD <br /> OPERATION CONTROLS TO OPTIMIZE RAS FLOW PER MLSS <br /> AND WASTING REQUIREMENTS...Completed • <br /> HP043AIROI RBL 8/19/20 90712WJM1 AT 2230 ROOM WAS 90 DEGREES... Salem Heating replaced bad <br /> control board. <br /> Page 10 of 20 <br />