My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11996431
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
11996431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 8:00:21 PM
Creation date
1/2/2024 1:01:56 PM
Metadata
Fields
Template:
Permits
Permit Address
28681 NORTH FORK RD SE
Permit City
Lyons
Permit Number
555-21-007754-AUTH
Parcel Number
093E18BA01200
Permit Type
Authorization
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 3 <br /> Onsite Permit 555-21-007754-PRMT-01 <br /> Schedule or track inspections at www,buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555092552107 <br /> Schedule using the Oregon ePermitting Inspection App, search "epermitting" in the app store <br /> Date issued: 1/10/22 Expiration date: 1/10/23 <br /> Work description: FIRE-MAJ REP(D-BOX)TO REPL 2 BDRM SFD W/2 BDRM SFD <br /> Other special rqmt: DRAINFIELD EXISTING,WILL REPLACE CONTROL PANEL, DAMAGED BOXES AND HEADER PIPES. <br /> FIND FINAL LENGTHS OF DRAINFIELD LINES AFTER REPAIRS ARE FINISHED. <br /> CONSTRUCT A BARRIER TO PREVENT FURTHER VEHICLE TRAFFIC OVER DRAINFIELD AREA. <br /> Conditions of approval <br /> •This permit is for installing a new control panel, replacing damaged distribution boxes,and header <br /> pipes for the system on this property. <br /> •Find the lengths of all drainfield lines after repairs and note them on the as-built form <br /> •Construct a barrier to prevent further vehicle traffic from passing over the system area <br /> •An electrical inspection is REQUIRED for the control panel/pump wiring. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services, Building Codes Division, or the municipality with jurisdiction, is required for <br /> pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •Serial distribution, each trench bottom to be level and on contour. Use Drop box(es). <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level,and bedded. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> 1/10/22: 1:30:34PM ONS_OnsitePermit pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.