My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12008671
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
12008671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 3:25:30 PM
Creation date
1/9/2024 1:02:38 PM
Metadata
Fields
Template:
Permits
Permit Address
131 LOUISA ST
Permit City
Gates
Permit Number
555-21-000669-PRMT-01
Parcel Number
093E27DD03600
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-21-000669-PRMT-01 Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555070585606 <br /> Schedule using the Oregon ePermitting Inspection App, search "epermitting" in the app store <br /> Date issued:2/8/21 Expiration date:2/8/22 <br /> Work description: FIRE-MIN REP- REPLACE 3 BDRM MD WITH SAME <br /> Conditions of approval <br /> **PLEASE ADDRESS ACTUAL INSTALL LOCATION OF CONTROL <br /> PANEL AT TIME OF AS-BUILT** <br /> •This repair permit is for a new control panel. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must <br /> comply with applicable building, electrical, or other codes. An electrical permit and inspection <br /> from the Department of Consumer and Business Services, Building Codes Division, or the <br /> municipality with jurisdiction, is required for pump wiring installation. <br /> •The system must be installed by the property owner or a licensed sewage disposal business <br /> (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> -All work is to conform to OAR 340, Division 71 and 73. Make no Y <br /> changes in system location or <br /> 9 <br /> specifications without approval by the agent. <br /> -For product approval information and manufacturer installation requirements see DEQ website <br /> at: http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> 2/8/21:2:13:21PM Page 2 of 3 ONS_OnsitePermit_pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.