My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12014244
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
12014244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 8:00:15 PM
Creation date
1/18/2024 10:08:55 AM
Metadata
Fields
Template:
Permits
Permit Address
22636 JENNIE RD SE
Permit City
Lyons
Permit Number
555-21-002265-PRMT
Parcel Number
092E18DB00100
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Permit 555-21-002265-PRMT Page 2 of 3 <br /> Date Certificate Issued:01/11/2024 <br /> Work Description: FIRE-MAJ REP: 1 BDRM SFD <br /> Conditions of Approval <br /> This repair permit is for replacement of an existing septic system serving the dwelling at 22636 Jennie Rd SE that burned in the Beachie Creek Fire of <br /> 2020. <br /> •Properly decommission the old septic tank and submit appropriate documentation. <br /> The owner of a pressurized distribution system must maintain a contract with a certified maintenance provider to inspect,adjust and maintain the onsite <br /> system.The maintenance provider must submit an annual report and annual evaluation fee.Per the governor's executive order 20-60 the OMM agreement is <br /> not required for permit issuance but it is required prior to issuance of a CoSC. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if less than 36-in deep. <br /> Thirty-inch minimum diameter if greater than 36-in deep.Maintain access to septic tank for pumping and service. <br /> The pump and alarm must be wired on separate circuits in the control panel.Pump wiring must comply with applicable building,electrical,or other codes. <br /> An electrical permit and inspection from the Department of Consumer and Business Services,Building Codes Division,or the municipality with jurisdiction,is <br /> required for pump wiring installation. <br /> •Install the pump and system components in accordance with the approved pump curve and specifications. <br /> -A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer or pressure transport <br /> pipe from tank to drainfield. <br /> •The owner of a pressurized distribution system must maintain a contract with a certified maintenance provider to inspect,adjust and maintain the onsite <br /> system.The maintenance provider must submit an annual report and annual evaluation fee. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices, alteration permits, or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 1/11/24:5:02:10PM ONS_OnsiteCSC pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.