My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12014325
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
20-XXXXXX
>
12014325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 8:00:16 PM
Creation date
1/18/2024 11:06:49 AM
Metadata
Fields
Template:
Permits
Permit Address
703 1ST ST
Permit City
Scotts mills
Permit Number
555-20-007841-PRMT
Parcel Number
061E15CD00102
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fSint:41p ChecklisVAdvanTex°,Systems <br /> AX2ON Start-Up Checklist For Oregon Service Providers <br /> Secondary TFea$nent System Timer Settings: <br /> Recirculafng Splitter Valve Assembly.Verify the following; ON Time: t . <br /> OFF Time: 9• o <br /> Q Verify proper stinger length.Stinger length: NI/Pc OVR ON Time: <br /> AdvanTex System(AX2ON).Verify the following: OVR OFF Time: 9. a <br /> 21 A11 pods Installed level. [ Proper wire size used based on!donation provided by <br /> gni pin ng properly covered and compacted. manufacturer. <br /> • <br /> Ventilation System.Verify the following: ❑Conduit seal installed. <br /> Q Ventitatlon Intake(s)properly located and Installed. <br /> ErAii elecirlcri connections in panel are secure. <br /> AdvanTex Filter Operation.Take residual head measurement [Panel wired per manufacturer's wiring diagram. <br /> Pod#1: Qo!l EControi panel start-up procedures,as detailed In the AdvanTex <br /> Pod#2: Installation Guide,have been followed. <br /> Secondary Treatment Notes: tr-.JApprapriate diagrams left in panel for future review. <br /> Controls Notes: <br /> Discharge Pump Basin/Tank.Verify the following: <br /> Basin t�odel/Fank size(s): RT Final/Safety Inspection <br /> OVisualiy Inspect basin tanks for infiltration. Verify the following; <br /> - C eek hat-Une-basinitankfsseHeve. R I . <br /> Discharge Basintrank Pumping Equipment Verify the following: OAt!access riser hardware is in place.Lids are secured. <br /> aPumping equipment Installed properly Control panel documentation Is left at site;panel is set <br /> aPump and discharge plumbing are compatible for automatic operation and secured. <br /> (e.g.pressure rating). Final Notes: Fx j5-kr.vy1 tC4 t)V\ -r Q . <br /> Pump model Installed: P3DDrj 1 \ J <br /> DiiIscharge plumbing property Installed through watertight <br /> grommet,and bag valve Is In open position. <br /> Floats operate property. <br /> [v�Roats set properly. .r c2d: a3 t1 <br /> [S Er-Splice box mounted in access riser.Watertight connectors Homeowner's Package <br /> used. <br /> ❑Homeowner's Package(and manual)has been reviewed <br /> Discharge Basin/Tank Pumping System.Verify proper operation of the with homeowner by....(check one) <br /> discharge basin tank pumps. (l installer <br /> 2 Pumps operate in Manual 46163. ( C� a; <br /> 2Pumps operate In Automatic vows 1 'I [1 Provider <br /> Controls Other Notes: <br /> NOTE Refer to the control panel instructions for detailed operational <br /> features of the control panel itself. <br /> RR!Number. 1 455-'a A`' <br /> Control Panel model installed: \JC,OVv Ax <br /> l 2ON E <br /> sct-A¢X-OM-oa-t <br /> Rev.1.1,0 nR5 O 2005 arem=systems'lee, <br /> Page;of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.