Laserfiche WebLink
EXPIRED <br /> Onsite Permit 555-21-000780-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555080498690 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued:2/18/21 Expiration date:2/18/22 <br /> Work description:NEW INSTALL: 4 BDRM SFD <br /> Stake out required: Yes <br /> Groundwater type: Permanent Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground surface. <br /> Twenty-inch minimum diameter if less than 36-in deep. Thirty-inch minimum diameter if greater <br /> than 36-in deep. Maintain access to septic tank for pumping and service. <br /> -The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must <br /> comply with applicable building, electrical, or other codes.An electrical permit and inspection from <br /> the Department of Consumer and Business Services, Building Codes Division, or the municipality <br /> with jurisdiction, is required for pump wiring installation. <br /> •A minimum 18-gauge, green-jacketed tracer wire or green color-coded metallic tape must be <br /> placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 2/18/21:1:51:28PM Page 2 of 3 ONS_OnsitePermit_pr <br />