My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12015913
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
12015913
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2024 8:18:46 AM
Creation date
1/19/2024 2:01:13 PM
Metadata
Fields
Template:
Permits
Permit Address
25295 SANTIAM PARK RD SE
Permit City
Lyons
Permit Number
555-21-000222-prmt
Parcel Number
092E22C 00800
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-21-000222-PRMT Page 3 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555005933331 <br /> Schedule using the Oregon ePermitting Inspection App, search "epermitting" in the app store <br /> WO*teripticar FIRE-MA. <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at: <br /> http:l/www.deq.state.onus/wq/onsite/onsite.htm EXPIREDGeneral Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is <br /> noted on this permit.Renewal of a permit may be granted if an application for permit renewal is received <br /> before the permit expiration date. Reinstatement of a permit may be granted if an application for permit <br /> reinstatement Is received within one year after the permit expiration date.Transfer of a permit from the <br /> permittee to another person may be granted if an application for permit transfer is received before the permit <br /> expiration date and no other changes to the permit are necessary. <br /> Installation Requirements:The drainfield must be installed in undisturbed native soil.No alterations of the <br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas <br /> for both the initial and replacement systems are allowed, unless otherwise authorized by the Agent.Do not <br /> install system when soil moisture, high groundwater,adverse weather,or other conditions that could affect the <br /> quality of installation or reliability of the system are present. If such conditions are present and there is a need <br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in <br /> 340-071-0160(9). <br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when <br /> the construction,alteration,or repair of a system for which a permit was issued is completed(except for the <br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date,unless the permitting agent elects to waive the inspection <br /> and authorizes the system to be backfilled earlier. Receipt and acceptance of a completed Final Inspection <br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final <br /> inspection.Faxed copies are acceptable for inspection request purposes only.Originals must be received <br /> before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting <br /> agent has approved the construction installation,*or the inspection has been waived'or the Certificate of <br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been <br /> conducted within 7 days of notification of completed installation). <br /> Unless otherwise required,it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC.Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones,frozen clumps of earth,masonry,stumps,waste construction materials, <br /> or other materials that could damage the system.Be sure that the untreated building paper,filter fabric,or <br /> other material approved by the agent is completely covering all drain media where required prior to backfill. <br /> The system can be connected to and placed into service once it has been properly backfilled and the CSC has <br /> been issued. <br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt <br /> or concrete,filling,cutting,or other soil modifications. <br /> '' -1 GA7'0 <br /> CIJ7 - <br /> imberlee Aldrich Onsite Wastewater Specialist 2 12/8/22 <br /> 12/8/22:10:25:42AM ONS_OnsitePermit pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.