Laserfiche WebLink
Septic Site Evaluation 555-24-005043-EVAL Page 2 of 2 <br /> ii r - a 7 t $ ,. ,> jai s °�z <br /> �lattss�tscf 07�3�2� '� <� � � v �� � �'�' � '� �� <br /> Appfi nAtatus S Ev'Muatiprt AR.rave ,17:e4U.SIA,� R4 � <br /> Wo description S B4shm SFD -4 BDRM AD ' "40 `�� <br /> ApeC4PReg i{etrenfs1 0 Initial System Replacement Area <br /> Stakeout required: Yes Yes <br /> Groundwater type: Temporary Temporary <br /> Drainfield type: Standard Standard <br /> Drainfield sizing: 125 linear ft/150 gal. 125 linear ft/150 gal. <br /> Pump to drainfield required: Yes Yes <br /> Other special requirement: This is for a 4 bedroom ADU,per DEQ This is for a 4 bedroom ADU, per DEQ this <br /> this drainfield must be connected to drainfield must be connected to existing <br /> existing drainfield drainfield <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system.Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site,or placement of wells or utilities,etc., may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> ' the site evaluation report,plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted,and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable,burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> �lanielle Brown Onsite Wastewater Inspector 2 7/3/24 <br /> CALL BEFORE YOU DIG—IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center Is 1.800-332-2344.) <br /> 7/3/24:8:46:56AM Page 2 of 2 ONS_OnsiteEvaluationpr <br />