Laserfiche WebLink
Septic Permit 555-24-002761-PRMT Page 2 of 3 <br /> Date Gert�frcatlsstted 07Itt8t2tlZ4 � , cv ;V_ < r <br /> WOrtettecriptiornt J i EP 4 SD M "A <br /> K � CE€ t[titiSu GFI FOYa <br /> C.a �n_'..u, s',s .,Ir*„v, �°, .. ._,. .::. .ax., ". .a,`«'=�s'.';',1;,�':;.. 4�,r . . *"."�.:'?. '.i»,p- �r ., .,.% "s»»a tc.F.?..a:., ,,`,>1.7 .x 't;." <br /> 4 <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent,including any changes made by the agent. <br /> •All work is to conform to OAR 340,Division 71 and 73. Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •The ATT system must be designed to prevent untreated waste from passing into the absorption field if the treatment system <br /> malfunctions. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the manufacturer to <br /> inspect,adjust and maintain the onsite system.The maintenance provider must submit an annual report and annual <br /> evaluation fee. <br /> •Gravelless absorption method rules at OAR 340-071-0290(6).Pressurized distribution required w/distribution piping <br /> perforated with 1/8 inch diameter orifices on maximum 2-foot centers at the 12 o'clock position and at least a 2-foot <br /> residual head at the distal orifice. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> Y 1 z' s s tiot'"q r' q ,t W <br /> k f:@fId C1f SBttSfaCtCOErt Cd [far� .., f" <br /> eu £� t <1 . o .&;54n,z�,A <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: A Certificate of Satisfactory Completion was issued on 07/08/2024 and the system is authorized for connection. <br /> erg'7 <br /> ,, � .,t GampCelEerl„tttsecton _€ ,',. <br /> Inspector Inspection Inspection Date Inspection Result <br /> Danielle Brown 7999 Final Septic 07/08/2024 Approved <br /> Danielle Brown 7020 Pre-cover 07/02/2024 Approved <br /> 7/8/24:1:30:10PM ONS_OnsiteCSC_pr <br />