Laserfiche WebLink
Septic Permit 555-21-009752-PRMT Page 2 of 3 <br /> Dateedirtificate` 6'ue 6f t�1624 ', " <br /> WoricileScriptior rr 111�1 NSTALLI BD M S itg78c5SONA E4S $ OP/Ol lql � <br /> 9,M944 P .�«mGxaae.A fi/ <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical,or other codes.An electrical permit and inspection from the Department of Consumer and Business Services, Building <br /> Codes Division,or the municipality with jurisdiction, is required for pump wiring installation. <br /> •An anti-buoyancy device is required for the septic tank(s)and must be installed as per the manufacturer installation guidelines. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> •AII work is to conform to OAR 340, Division 71 and 73.Make no changes in system location or specifications without approval <br /> by the agent. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1.In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2.Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply,including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> C:e�rtifcafe 7 1a Yo 3� OCIi O *1 <br /> �� ,` a. ,k.< a ,« .a. .ate .... e .P. . . . ",.s ...s'., ..��;:.x.. +k-.A''.;�, '�`a"�.c ma3. <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: N/A <br /> 1 14 MO' oirepkefed t„specJon 26, , 40AM- <br /> Inspector Inspection Inspection Date Inspection Result <br /> Matt Knudsen 7999 Final Septic 07/22/2024 Approved <br /> Aidan Bammes 7020 Pre-cover 08/25/2022 Partial <br /> Kimberlee Aldrich 7100 Septic Tank 08/25/2022 Approved <br /> Aidan Bammes 7999 Final Septic 08/25/2022 Partial <br /> Aidan Bammes 7020 Pre-cover 08/18/2022 Partial <br /> 7/23/24:8:38:54AM ONS_OnsiteCSC pr <br />