Laserfiche WebLink
Septic Site Evaluation 555-24-004621-EVAL Page 2 of 2 <br /> Date issued:07/23/2024 <br /> Application status:Site"Evaluation Approved <br /> Work description:SE'FOR FUTURE 4:BDRM SFD <br /> Min depth: 18 in. 18 in. <br /> Special.Requirements; Initial System Replacement Area <br /> Stakeout required: Yes No <br /> Groundwater type: Permanent Permanent <br /> Drainfield type: Pressure Distribution Pressure Distribution <br /> Drainfield sizing: 75 linear ft/150 gal. 75 linear ft/150 gal. <br /> Pump to drainfield required: Yes No • <br /> Other special requirement: can use either pressurized distribution or can use either pressurized distribution or <br /> pressurized seepage bed, both require an pressurized seepage bed, both require an <br /> operation and maintenance agreement to operation and maintenance agreement to issue <br /> issue permit and is required for the life of permit and is required for the life of the system <br /> the system <br /> Conditions of approval: <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system.Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site,or placement of wells or utilities, etc.,may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report, plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted,and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable,burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> ,tholq152A/(4 CtS26&KM 101(41)- AVottill);(4 <br /> <imberlee Aldric Onsite Wastewater Specialist 2 7/23/24 <br /> CALL BEFORE YOU DIG...IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 7/23/24:11:56:48AM Page 2 of 2 ONS_OnsiteEvaluation_pr <br />