Laserfiche WebLink
Onsite Permit 555-24-004768-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555037517725 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> �a >ix ratfort data -rea <br /> ba a issued 6125/24 � ,�d y � � � w <br /> WIG cr iao .Ml�r �REi' F0- 50 4Erl fi, a�, � " <br /> Conditions of approval <br /> 'The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> 'Vehicular traffic and livestock must be restricted from the system area. <br /> •AII roof drains must be directed away from the system <br /> All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain <br /> access to septic tank for pumping and service. <br /> 'Meet all required setbacks <br /> 'The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent,including any changes made by the agent. <br /> -All work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications <br /> without approval by the agent. <br /> -For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.govideq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed <br /> on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 'Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before <br /> connecting to the distribution unit.It must be installed with a minimum fall of 4 inches per 100 feet and <br /> at least 2 inches of fall from one end of the pipe to the other.In addition,there must be a minimum <br /> difference of 8 inches between the invert of the septic tank outlet and either the invert of the header to <br /> the distribution pipe of the highest lateral in a serial distribution field or the invert of the header pipe to <br /> the distribution pipes of an equal distribution absorption field. <br /> 6/25/24:9:06:49AM ONS_OnsitePerrnitJDr <br />