Laserfiche WebLink
Septic Permit 555-24-003589-PRMT Page 2 of 3 <br /> ort�� �� ra`, ti »'-��``T�,J {��"•��{- "' x �„, �� sw 4 �w,'+�n r,'� g� � 3�3., u a. A `� �` <br /> ca ts: Ott'=1�2024 v{tom P R q"�E k '. 4- , xc1 Aiy <br /> k3 ,. k eR z <br /> V1tooDescription 4 E"AI L C 2 SFD I E SAM �� � <br /> % a " 7 r v n 4,t <br /> ......;°, >. .. � x"y� ... <br /> ar one+itlarC Approva <br /> •Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with <br /> acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10%variation. <br /> •The owner of a pressurized distribution system must maintain a contract with a certified maintenance <br /> provider to inspect, adjust and maintain the onsite system.The maintenance provider must submit an <br /> annual report and annual evaluation fee. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> -The system must be installed by the property owner or a licensed sewage disposal business (installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty- <br /> inch minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. <br /> Maintain access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> -The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty- <br /> inch minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. <br /> Maintain access to septic tank for pumping and service. <br /> .Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •AII work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or <br /> specifications without approval by the agent. <br /> .The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply <br /> with applicable building, electrical, or other codes.An electrical permit and inspection from the Department <br /> of Consumer and Business Services, Building Codes Division,or the municipality with jurisdiction, is <br /> required for pump wiring installation. <br /> Install the pump and system components in accordance with the approved pump curve and <br /> specifications. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be placed on <br /> top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 7/25/24:10:53:26AM ONS_OnsiteCSCpr <br />