My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12302588
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
22-XXXXXX
>
12302588
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 9:31:45 AM
Creation date
8/5/2024 3:47:21 PM
Metadata
Fields
Template:
Permits
Permit Address
22430 BOONES FERRY RD NE
Permit City
Aurora
Permit Number
555-22-011641-PRMT
Parcel Number
041W11A 00600
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AX-FAT Start-Up Checklist <br /> Service Provider e Ji, lit <br /> Q'icxr Ip— 1=ZOZ3Tcian Start-Up Date Occupancy Date <br /> Primary'treatment Other System Components <br /> Septic Tank. ❑ Disinfection system operating(tf installed). <br /> ❑ Indicate model of Blotube®filter installed In septic tank: V Dispersal.equip mentoperating. <br /> El FT0822-148(base inlet model)" <br /> R-FTSO444-36V(Schedule-40:outlet pipe) _ - <br /> Controls <br /> ❑ FTW0444-36V(Type 3034 outlet pipe) tglProper timer settings per p g Appendix 1 in AdvanTexO&M°Manua! <br /> ►.q,"Biotube,filter installed correctly on the septic tank outlet. <br /> Port 1,AIR-OM-AM-1 <br /> �4 At grade.access to Biotube filter. •Proper wire size used per Orenca Wire Tables;NCH-PU-PU-3. <br /> N Riser lid secured to the septic tank access riser. Panel wired per manufacturer's wiring diagram. <br /> All electrical connections in panel secured. <br /> Secondary'ireatment Control panel functronal.test,as detailed.In the AdvanTex <br /> Installation Instructions,has been followed. <br /> AXzg Unit 111 Dial.tone verified.(ForVCOM panels only.) <br /> Ix Transport line,has a minimum fall of Vs in.per foot(10 mm perm) <br /> S <br /> from septic tank to AX RlService provider name/number:written on"For Service Call"label, <br /> AX-RT unit installed level and;on a stable base. Centro!panel diagrams left in panel for future review. <br /> Unit is installed in series with or'perpendicular to septic tank,or <br /> Final/Safety inspection <br /> Unit:is installed with correct minimum offset from septic tank p. <br /> (if Installed parallel to tank): .All access riser hardware is.in pike.Lids are secured: <br /> ❑ 4 ft(1.2 m).offset(when no antibuoyancy measures are used). All splice box lids are secured. <br /> El '6 ft(1',8.m)offset(when'antibuayancy measures are:used). panel circuit breakers are In the°on°position,panel is set for <br /> All piping'properly covered and compacted. automatic.operation,and panel is latched(or locked if necessary). <br /> Ventilation System <br /> Passive air.vent line has minimum 1/a in:per foot:(1:0 mm per meted ItOmeOWnler'$ Package <br /> fall toAX-Ri. 4 .Homeowner's:Package reviewed With homeowner. <br /> jg Passive air vent on/iX-AT unit is Installed. <br /> Retire.Pumping,System Comments <br /> ..NFloats operate.. <br /> Pump operates in'Manual." <br /> Pump operates in"Automatic." <br /> Pump run amps: <br /> NI Pump rest:volts:. run Volts: `CSC .t <br /> AX- Manifold and Spin Nozzle Operation <br /> Manifold end cap closed,. <br /> Complete,square spray pattern with full coverage of sheets. <br /> ❑ Manifold pressure: <br /> (Typically 3:0-3.5 psi or20.7-24.1 kPa.) <br /> Discharge Pumping System(pump discharge only) <br /> / Floats operate. <br /> 151 Pump discharge plumbing connected. <br /> `2 °Off°float adjusted far correct discharge dose to dispersal. <br /> ©;2011 CrencoSysfems®Inc. SCL-ATX AX iT-OM-1 <br /> Rev,2.0,©'0at11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.