Laserfiche WebLink
Onsite Permit 555-24-002398-PRMT Page 4 of 6 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555092724306 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued 5l21''24 ¢¢,, b a ,K x a Expiration date ,5,21 25 <br /> z <br /> Work escription Fla giMAJAREFa13,BDR SF0 TO"R Pt 2 Bfl M p e$ - '‘vi lr <br /> Conditions of approval <br /> •The system must be installed by the property owner or a licensed <br /> sewage disposal business (installer). <br /> •Dry soil installation only (June 1 — October 1 unless otherwise <br /> authorized by the agent). <br /> "Vehicular traffic and livestock must be restricted from the system <br /> area. <br /> •AII roof drains must be directed away from the system <br /> •AII tanks must be tested for watertightness and have a water-tight riser <br /> to the ground surface. Twenty- inch minimum diameter if less than 36-in <br /> deep. Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> "The system must be installed in the area approved during the site <br /> evaluation and in accordance with the construction plan approved by • <br /> the agent, including any changes made by the agent. <br /> •AII work is to conform to OAR 340, Division 71 and 73. Make no <br /> changes in system location or specifications without approval by the agent. <br /> "The pump and alarm must be wired on separate circuits in the <br /> control panel. Pump wiring must comply with applicable building, <br /> electrical, or other codes. An electrical permit and inspection from <br /> the Department of Consumer and Business Services, Building Codes <br /> Division, or the municipality with jurisdiction, is required for pump <br /> wiring installation. <br /> •Install the pump and system components in accordance with the <br /> approved pump curve and specifications. <br /> •A minimum 18-gauge, green-jacketed tracer wire or green color-coded <br /> metallic tape must be placed on top of the effluent sewer or pressure <br /> transport pipe from tank to drainfield. <br /> "Pressurized distribution rules at OAR 340-071-0275. Install sweep <br /> elbows at ends of lateral piping with acceptable threaded plugs or <br /> 5/21/24:9:28:23AM ONS_OnsitePermitpr <br />