Laserfiche WebLink
Septic Permit 555-24-001360-PRMT Page 2 of 3 <br /> 7a e4 F;, <br /> qCQ <br /> Wo C4 ,9 ' tom g 1I L ?tl s <br /> z"8 <br /> ,..� �c& �?";-'..,.,.. .,.,,�"��� ^-u� �1�..._,. .�. � , .>n.o rc: � :�. 3v$ � �. .. � :�:� <br /> ig9.9.0 ikir rl PI Meets/ e, <br /> ,,.E...,. .* ....w... m. 9v....�Y.u.4f ry ............. .1...a,. .�$�.„F+a. ,,:.a„v s.e«..., �e �L°. .b.� ..�_ ... • w, .. eT`.�D. m. ,_ .......evL^ <br /> •Dry soil installation only(June 1—October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if <br /> less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access to septic tank for pumping and <br /> service. <br /> -Meet all required setbacks <br /> -The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent,including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73.Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •An anti-buoyancy device is required for the septic tank(s)and must be installed as per the manufacturer installation <br /> guidelines. <br /> -A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> -Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the <br /> distribution unit.It must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from one <br /> end of the pipe to the other.In addition,there must be a minimum difference of 8 inches between the invert of the <br /> septic tank outlet and either the invert of the header to the distribution pipe of the highest lateral in a serial distribution <br /> field or the invert of the header pipe to the distribution pipes of an equal distribution absorption field. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length,level,and bedded. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> -Maximum length of an individual trench is 150-feet. <br /> •Equal distribution, all trench bottoms must be at the same elevation.Use Distribution box(es). <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1.In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> System Inspection: No Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: Yes <br /> Comments: A Certificate of Satisfactory Completion was issued on 08/16/2024 and the system is authorized to connect to a <br /> 3BDRM Single Family Dwelling. <br /> wpte <br /> 8/16/24:10:42:32AM ONS_OnsiteCSC pr <br />